Condition 1: The contact is now
closed
4.
Slowly push the switch contact
in the direction of flow until the
contact opens
Condition 2: The contact is now
open
5.
Slowly push the switch contact
in the direction of flow until the
contact closes, then keep
pushing slowly in the direction of
flow until the contact opens
6.
Tighten the set screws of the
switch contact (Fig. 34/1) using
a flat-bladed screwdriver. When
doing so, observe the correct
tightening torque of the screws.
ð
The set switch point corre-
sponds to the switch-off
point of the switch contact
by decreasing flow.
6.2 Checking the flow
Reading-off the flow value
Personnel:
n
Qualified personnel
Protective equipment:
n
Goggles
Fig. 35: Reading-off the measuring
scale
1.
The top edge of the float is the
read-off point
Operation
Checking the flow
03.09.2018
DWG Module BASICS Flow Monitor
49