11.
Tighten the set screws
(Fig. 60/1) observing the proper
tightening torque of the screws
(
)
12.
Position the female socket and
gasket, then tighten fixing screw
8.6 Measures to be
taken after mainte-
nance work
Take the following steps after comple-
tion of maintenance work and before
switching on the device:
1.
Check all previously loosened/
released screw connections for
tightness.
2.
Clean the work area and
remove all residual materials,
packaging, substances or spills.
Maintenance
Measures to be taken after maintenance work
03.09.2018
DWG Module BASICS Flow Monitor
72