85
Figure 59: CT Winding Test Screen –Abort
14.
Test can also be stopped under emergency condition by hitting the “Emergency Push to Stop”
button on the front panel of MRCT. Unit will shut off the output voltage
15.
After releasing the Emergency Stop Button, the test will need to be restarted.
16.
Upon completion of all tests the results will be displayed in the test screen or in a
test report.
Figure 60: CT Winding Results - Non Concurrent
Winding resistance test is used to determine if the dc resistance of the CT secondary winding is
within specification or not. A DC current is applied and voltage is measured to determine the