81
11.
The Winding Resistance test will begin.
Voltage (V): The MRCT displays the real time voltage readings of the secondary winding while
the test is in progress.
Current (A): The MRCT the real time current readings for the secondary winding while the test is
in progress.
12.
At any point of time Test can be terminated by hitting the ABORT button at the top
of the screen.
Figure 55: CT Winding Test ABORT
13.
Test can also be stopped under emergency condition by hitting the “Emergency Push
to Stop” button on the front panel of MRCT. Unit will shut off the output voltage
14.
After releasing the Emergency Stop Button, the test will need to be restarted.
15.
Upon completion of all tests, the results can be viewed in the test screen or in a test
report.