14
3.0 SETUP
3.1 Unpack System
Unpack the unit and check for evidence of any shipping damage. If there is any visual damage,
immediately notify the freight carrier to make a damage claim, and notify Megger of the damage.
3.1.1 Initial Start Up
1.
If the unit was ordered with an STVI, using the Ethernet cable supplied with the unit connect the
STVI Ethernet Port on the MRCT unit to the Ethernet port on the top of the Smart Touch View
Interface (STVI).
2.
Before connecting power to the unit, make sure the MRCT POWER ON/OFF Switch is in the OFF
position (0). Plug the unit line cord into an appropriate power source and turn the POWER
ON/OFF Switch to ON (I). As the MRCT unit goes through its power up sequence, in about a
minute the STVI power up screen will appear, then the test configuration screen will appear.
3.2 Communication Ports
There are two types of communication ports on the STVI, one Ethernet, and two USB ports.
3.2.1 Ethernet Port
There is one Ethernet port on the STVI for connecting to the MRCT units. On the MRCT the port is
labeled STVI. For the MRCT it connects to the PoE power supply unit, and the PoE unit is connected to
the PC/IN port on the MRCT
Figure 4:
STVI port on MRCT