18
4. Once the cables are removed from the splitter box the nozzles can be unscrewed from nozzle plate. Once
unscrewed the nozzle can be relocated to the position it is required in.
5. The blanking plate will need to be removed from the location where the nozzle is required and moved to the
location the nozzle was removed from.
6. The cables can then be fed through the hole and the nozzle located in its new position, make sure the O-ring is
seated correctly before tightening the nozzle to the plate.
O-Ring
Содержание IonWash
Страница 1: ...1 Operating Manual IonWash The revolutionary component cleaning system March 2018...
Страница 2: ...2...