IOMM AGZ-3
AGZ 035A through 065A
33
Software Description (Global UNT Interface Kit required to read or
change variables)
Variable Name
Description
Default Value
Range
LPSS
Low Pressure Starting Setpoint
10 psi
5 to 15 psi
SLPT
Starting Low Pressure Time
260 sec
90 to 300 seconds
MLPS
Minimum Low Pressure Setpoint
5 psi
Calculated (LPSS-LPSD) 5 psi
LPSD
Low Pressure Starting Differential
5 psi
3 to 10 psi
LPFS
Low Pressure Freezestat setpoint
54 psi
30 to 55 psi
LPHL
Low Pressure High Limit
57 psi
40 to 60 psi
LPLL
Low Pressure Low Limit
55 psi
40 to 55 psi
FSTP
Freezestat Time Period
60 sec
60 seconds fixed
PDTD
Pumpdown Delay Time Period
60 sec
60 seconds fixed
Hot Gas Bypass (Optional)
This option allows the system to operate at low loads without the ON-OFF cycling of the compressor.
When the hot gas bypass option is used it is required to be on both refrigerant circuits because of the
lead / lag feature of the Global UNT controller.
This option allows passage of discharge gas into the evaporator inlet (between the TX valve and the
evaporator) which generates a false load to supplement the actual chilled water load.
Note:
The hot gas bypass valve cannot generate a 100% false load.
The valve that is supplied can provide a load of approximately 10 tons. The system load added to the
ten tons of the hot gas bypass valve has to exceed the compressor capacity for stage 1 compressors for
stable system operation. This requires 3-6 tons of system load.
A solenoid valve in the hot gas bypass lines is wired in parallel with both circuit’s liquid line solenoid
valves SV1 and SV2. The hot gas bypass is available whenever a refrigerant circuit is operating. The
hot gas valve is regulating by the evaporator pressure and the remote adjustable bulb. The pressure
regulating valve is factory set to begin opening at 58 psig (32°F for R-22). This setting can be
changed by adjusting the remote adjustable bulb. Remove the cap on the remote bulb and raise the
pressure by turning the adjustment screw clockwise. Lower the pressure by turning the adjusting
screw counterclockwise. This changes the pressure that the hot gas bypass valve will start to open.
Do not force the adjusting screw as this can damage the adjusting assembly.
WARNING
The hot gas line may become hot enough to cause injury. Be careful during
valve checkout.
Note:
The remote adjusting bulb must be installed on the outside of the suction line
insulation. The bulb has to have a stable ambient air temperature for proper operation.
Placing the bulb in contact with the evaporator refrigerant line will limit the operation of the
hot gas bypass valve.
Содержание AGZ 035A
Страница 6: ...6 AGZ 035A through 065A IOMM AGZ 3 Figure 3 Clearance Requirements...
Страница 18: ...18 AGZ 035A through 065A IOMM AGZ 3 Electrical Legend Figure 8 Electrical Legend...
Страница 19: ...IOMM AGZ 3 AGZ 035A through 065A 19 Figure 9 Typical Field Wiring with Global UNT Controller...
Страница 20: ...20 AGZ 035A through 065A IOMM AGZ 3 Figure 10 Typical Field Wiring Diagram with MicroTech Controller...
Страница 21: ...IOMM AGZ 3 AGZ 035A through 065A 21 Figure 11 Single point Connection with FanTrol...
Страница 22: ...22 AGZ 035A through 065A IOMM AGZ 3 Figure 12 Single point Connection with SpeedTrol...
Страница 23: ...IOMM AGZ 3 AGZ 035A through 065A 23 Figure 13 Unit Control Schematic UNT...
Страница 24: ...24 AGZ 035A through 065A IOMM AGZ 3 Figure 14 Staging Schematic UNT...
Страница 25: ...IOMM AGZ 3 AGZ 035A through 065A 25 Figure 15 MicroTech Controller Schematic...
Страница 26: ...26 AGZ 035A through 065A IOMM AGZ 3 Figure 16 Unit Control Schematic MicroTech...
Страница 27: ...IOMM AGZ 3 AGZ 035A through 065A 27 Figure 17 Staging Schematic MicroTech...
Страница 94: ...94 AGZ 035A through 065A IOMM AGZ 3 Notes...
Страница 95: ......