Sequence of Operation

Starting

With control power on, 115Vac power is applied through F1 to the compressor crankcase heaters and
control transformer T2.  T2 supplies 24Vac to the Global UNT controller.  The green light on the
Global UNT controller will begin to flash.  The panel Alarm Light will illuminate.  Put the System
Switch S1 into the AUTO position.  This applies power to the control circuit and a digital input to the
Global UNT controller.  Control power is applied through the MHP’s to the compressor inherent
motor protectors.  After approximately a two (2) minute time delay, the MP’s are energized and the
panel Alarm Light will turn off.  If this is a first start, depress the Freezestat Reset Button for 1
seconds.  There is a default time delay of 5 minutes on the Freezestat reset.

Start the chiller water pump and put the chiller into the run mode by closing the remote start / stop
input or time clock input.  After the flow switch has made, the Global UNT controller will begin to
ramp up if the chilled water temperature is above the leaving water setpoint dial plus 1/2 the control
band dial.  Internal timing functions will vary the stage up time.

The refrigerant circuit starting is switched between circuits every ten (10) starts.  This maintains equal
starts on the first compressor of each refrigerant circuit.  Refrigerant circuit #1 is assumed as the
starting circuit for the following.

When the first stage of cooling is required, relay BO1 will be energized and if the evaporator pressure
is above the LPSS (low pressure starting setpoint), relay BO7 will be energized starting Compressor
#1 and energizing the liquid line solenoid valve (SV1) through control relay CCR1.

As additional cooling is required, relay BO2 will be energized and if the evaporator pressure is above
the LPSS (low pressure starting setpoint), relay BO8 will be energized starting Compressor #2 and
energizing the liquid line solenoid valve (SV2) through control relay CCR2.

As additional cooling is required, relays BO3 and BO4 will start compressor #3 and #4 respectively.

The reverse will occur as the cooling requirements are reduced.  Relays BO4 and BO3 will open
stopping compressors #4 and #3.  Relay BO2 will open closing the #2 refrigerant liquid line solenoid
valve.  Compressor #2 will continue to operate until the LPLL (low pressure low limit) is reached or
the PDTD (pumpdown delay time period) timer times out.  Relay BO8 will open stopping compressor
#2.  Relay BO1 will open closing the #1 refrigerant liquid line solenoid valve.  Compressor #1 will
continue to operate until the LPLL is reached or the PDTD timer times out.  Relay BO7 will open
stopping compressor #1.  The compressors will not cycle on if the evaporator pressure exceeds the
LPSS setpoint.  The Global Scroll Chiller has a one time pumpdown.

Standard Controller Setpoints (optional Zone Terminal required to
change values)

VALUES

TEMPLATE

NAME

FACTORY SETPOINT

RANGE

OA/AI3 Lim SP

80°F

0 to 100°F

OA/AI3 Reset SP

-40°F

-100 to 100°F

LvgWtr Rband SP

0°F

0 to 15°F

Unoccpd Lvg SP

70°F

40 to 90°F

OA Lockout SP

-10°F

-20 to 65°F

Lvg Low Lim SP

20°F

20 to 40°F

SoftSta Capcty

50%

0 to 100%

SoftStart Time

2 min

0 to 20 minutes

Содержание AGZ 035A

Страница 1: ...peration and Maintenance Manual IOMM AGZ 3 Group Chiller Part Number 074641003 Effective June 2002 Supercedes IOMM AGZ 2 Air Cooled Scroll Compressor Chiller AGZ 035A through 065A 60 Hertz R 22 Global...

Страница 2: ...ontroller Installation and Operation 36 General Description 36 Optional Sensors 36 Controller Inputs Outputs 38 Additional Global UNT Features 42 Alarms 44 Zone Terminal Optional 45 Zone Terminal Glos...

Страница 3: ...lag switch to alternate the compressor starting sequence and sequenced starting of compressors The electrical control center includes all equipment protection and operating controls necessary for dep...

Страница 4: ...he base Block the pushing vehicle away from the unit to prevent damage to the sheet metal cabinet and end frame see Figure 1 To lift the unit 2 1 2 64mm diameter lifting holes are provided in the base...

Страница 5: ...compressors electrical control panel and piping components as shown in Figure 3 Do not allow debris to accumulate near the unit Air movement may draw debris into the condenser coil causing air starva...

Страница 6: ...6 AGZ 035A through 065A IOMM AGZ 3 Figure 3 Clearance Requirements...

Страница 7: ...lb Kg lb Kg lb Kg lb Kg 035AS 850 386 960 435 785 356 885 401 3480 1579 040AS 864 392 974 442 797 362 900 408 3535 1603 045AS 928 421 1048 475 858 389 966 438 3800 1724 050AS 940 426 1062 482 868 394...

Страница 8: ...vent freeze up down to 20 F 29 C It is suggested that the heating cable be wired to a separate 110V supply circuit As shipped from the factory the heating cable is wired to the control circuit All wat...

Страница 9: ...d be as shown in Figure 6 Connect the normally open contacts of the flow switch in the unit control center at terminals 5 and 6 There is also a set of normally closed contacts on the switch that can b...

Страница 10: ...plications Factor Correction Flow T Delta Capacity kW 18 4 l s Flow Glycol 3 Pressure drop Multiply the water pressure drop from Figure 7 by Pressure Drop correction factor from Table 4 or Table 5 to...

Страница 11: ...984 10 5 6 0 986 1 009 0 979 1 007 0 956 1 000 0 914 0 986 12 6 7 0 992 1 011 0 985 1 009 0 962 1 002 0 919 0 988 14 6 8 0 997 1 014 0 990 1 012 0 967 1 005 0 924 0 991 2000 feet 610 m 16 8 9 1 000 1...

Страница 12: ...9 2 82 5 17 23 1 137 8 62 3 9 51 3 23 040AS 11 5 93 5 87 28 8 155 9 78 4 9 58 3 67 045AS 11 2 106 6 69 28 2 177 11 15 4 8 66 4 18 050AS 13 4 117 7 38 33 6 195 12 30 5 7 73 4 61 055AS 16 2 129 8 14 40...

Страница 13: ...ERS HIGH EFFICIENCY FIN AND TUBE TYPE WITH INTEGRAL SUBCOOLING Coil Face Area sq ft 46 4 46 4 46 4 46 4 46 4 46 4 Coil Face Area m 2 4 3 4 3 4 3 4 3 4 3 4 3 Finned Height x Finned Length In 80 x 83 5...

Страница 14: ...5 50 75 100 0 25 50 75 100 CONDENSERS HIGH EFFICIENCY FIN AND TUBE TYPE WITH INTEGRAL SUBCOOLING Coil Face Area sq ft 46 4 46 4 46 4 46 4 46 4 46 4 58 0 58 0 Coil Face Area m2 4 3 4 3 4 3 4 3 4 3 4 3...

Страница 15: ...y the cooler heater Table 9 AGZ 035A 065A 60 Hz Single Point Power Electrical Data POWER SUPPLY Field Wire Hub AGZ Unit Size Volts Minimum Circuit Ampacity MCA Quantity Wire Gauge Quantity Nominal Siz...

Страница 16: ...3 7 350 425 230 41 5 52 8 5 8 4 23 7 350 425 380 28 0 32 7 3 4 4 14 4 195 239 460 21 8 23 7 2 8 4 10 7 158 187 055A 575 17 3 22 1 2 3 4 11 5 125 148 208 52 8 52 8 5 8 4 23 7 425 425 230 52 8 52 8 5 8...

Страница 17: ...Therefore it is recommended that power leads be kept short All terminal block connections must be made with copper type THW wire 5 Recommended Fuse Sizes are selected at approximately 150 to 175 of th...

Страница 18: ...18 AGZ 035A through 065A IOMM AGZ 3 Electrical Legend Figure 8 Electrical Legend...

Страница 19: ...IOMM AGZ 3 AGZ 035A through 065A 19 Figure 9 Typical Field Wiring with Global UNT Controller...

Страница 20: ...20 AGZ 035A through 065A IOMM AGZ 3 Figure 10 Typical Field Wiring Diagram with MicroTech Controller...

Страница 21: ...IOMM AGZ 3 AGZ 035A through 065A 21 Figure 11 Single point Connection with FanTrol...

Страница 22: ...22 AGZ 035A through 065A IOMM AGZ 3 Figure 12 Single point Connection with SpeedTrol...

Страница 23: ...IOMM AGZ 3 AGZ 035A through 065A 23 Figure 13 Unit Control Schematic UNT...

Страница 24: ...24 AGZ 035A through 065A IOMM AGZ 3 Figure 14 Staging Schematic UNT...

Страница 25: ...IOMM AGZ 3 AGZ 035A through 065A 25 Figure 15 MicroTech Controller Schematic...

Страница 26: ...26 AGZ 035A through 065A IOMM AGZ 3 Figure 16 Unit Control Schematic MicroTech...

Страница 27: ...IOMM AGZ 3 AGZ 035A through 065A 27 Figure 17 Staging Schematic MicroTech...

Страница 28: ...5 40 2 1021 36 2 920 3535 1605 3460 1570 445 200 045AS 86 2 2190 81 7 2075 61 6 1565 22 3 566 4 3 108 16 0 406 44 2 1123 40 8 1036 35 6 904 3800 1725 3695 1675 445 200 050AS 86 2 2190 81 7 2075 61 6 1...

Страница 29: ...e control band before the Global UNT controller will stage on cooling 4 Set the control band to 4 F as a starting point 5 Put both circuit switches to the AUTO position 6 Put switch S1 to AUTO positio...

Страница 30: ...o start the chiller after an extended shutdown follow the pre startup and startup instructions Water Piping Checkout 1 Check the pump operation and vent all air from the system 2 Circulate evaporator...

Страница 31: ...Emergency Stop position 4 Put both circuit 1 2 switches to the Pumpdown and Stop position 5 Apply power to the unit The panel Alarm Light will stay on until S1 is closed Ignore the Alarm Light for the...

Страница 32: ...l be energized and if the evaporator pressure is above the LPSS low pressure starting setpoint relay BO7 will be energized starting Compressor 1 and energizing the liquid line solenoid valve SV1 throu...

Страница 33: ...t is supplied can provide a load of approximately 10 tons The system load added to the ten tons of the hot gas bypass valve has to exceed the compressor capacity for stage 1 compressors for stable sys...

Страница 34: ...ly important when the system has been serviced Immediately after the system has been opened for service the element may indicate a wet condition It is recommended that the equipment operate for about...

Страница 35: ...p level The function of the heater is to keep the temperature in the crankcase high enough to prevent refrigerant from migrating to the crankcase and condensing in the oil during off cycle Power must...

Страница 36: ...fittings and can be replaced without pumping the unit down The pressure transducers are connected to the Global UNT controller analog inputs with IDC connectors Insulation Displacement Connectors The...

Страница 37: ...r heater power source 120Vac is supplied from a separate external supply remove wires 540 and 545 as indicated on the unit wiring diagram Power Supplies There are several internal power supplies used...

Страница 38: ...Note The alarm signal is not active during a power failure and will not provide a Loss of Power alarm PC Connection The Global UNT controller can be connected to an IBM or IBM compatible computer for...

Страница 39: ...d Line Solenoid Valve 2 Circuit 2 Liquid Line Solenoid Valve 3 Compressor 3 Contactor M3 4 Compressor 4 Contactor M4 5 Spare 6 Spare 7 Low Pressure Relay Circuit 1 8 Low Pressure Relay Circuit 2 Reset...

Страница 40: ...Limit Leaving Water Setpoint plus Leaving Reset Band to the Leaving Water Setpoint When RWT reaches the RWHL the Actual Leaving Water Setpoint equals the Leaving Water Setpoint AI 4 If the RWT sensor...

Страница 41: ...X SW1 Off V X X X X Remote Reset 2 to 10VDC input When selected a 2 to 10Vdc signal is connected to TB 7 terminals 134 and 135 This input can be achieved by using a 4 20ma signal and conditioning it...

Страница 42: ...e Soft Start Capacity The duration of the soft load sequence is determined by the Soft Start Timer If the Soft Start Timer is set to zero no soft loading will take place The Zone Terminal is required...

Страница 43: ...stage up as additional cooling is required If the evaporator pressure is less than the LPHL the Global UNT controller will de energize BO7 or BO8 depends on circuit starting which will stop the compr...

Страница 44: ...r protection occurrence Freeze protection would be indicated on the optional Zone Terminal If a circuit is off and the panel alarm light is not on try depressing the Freezestat reset on the control pa...

Страница 45: ...ttings Figure 24 Zone Terminal MONITOR ADJUST TIME SCHEDULE PASSWORD ENTER Compressor 1 Compressor 2 Stage 3 Stage 4 Solenoid 1 Frzstat 1Alm Frzstat 2Alm MinLowPres 1 MinLowPres 2 Occupied Flow Failur...

Страница 46: ...ch of the three displays Read the symbols to the right of the display numbers to learn the on off status of various inputs outputs or modes On status m Off status This provides continuous monitoring o...

Страница 47: ...point in the HVAC controller with these symbols A bar for On a circle m for Off These are always monitor only items If the symbol flashes item is in alarm Red Alarm Light Flashes anytime a problem ex...

Страница 48: ...he right of the Mode Selector Panel flashes when any of the above items are in alarm Alarms cannot be cleared with the ZT The problem must be corrected by maintenance or repair of the affected item MA...

Страница 49: ...in algorithm for Outside Air Reset For an example of 10 F reset 45 F Leaving Water Setpoint reset up to 55 F Contrl Band SP Indicates what the Control Band Knob is set at Non adjustable from ZT Actual...

Страница 50: ...e Freez Stat Reset button located on the Control Panel must be pushed once to clear Frzstat 2Alm If circuit 2 fails on freeze the alarm light on the ZT will light To clear the alarm the Freez Stat Res...

Страница 51: ...UNT controller Replace if defective 3 Replace compressor 4 Check reasons for high condenser pressure Low Suction Pressure 1 Low refrigerant charge 2 Defective expansion valve 3 Dirty filter drier 4 Re...

Страница 52: ...kage Suction line temperature circuit 1 Suction line temperature circuit 2 Liquid line temperature circuit 1 Liquid line temperature circuit 2 Unit amp package Unit amperage Percent total unit amperag...

Страница 53: ...starting the unit For more information on menu items see the menu description section Modem kit An optional modem kit allowing remote monitoring of the chiller from an off site PC running McQuay Moni...

Страница 54: ...available for the alarm bell option Wire according to the field wiring diagram Analog Input Signals All sensors and transducers required for normal chiller operation are installed and wired at the fa...

Страница 55: ...alarm condition the alarm circuit will energize and the alarm status light will be on During a pre alarm condition the alarm output and status light will pulse on for one half second and off for four...

Страница 56: ...ving Cond Water Temp Leaving Cond Water Nozzle 40 to 263 F 0 1 F 11 11 Total Unit Amps Control Cabinet 0 to 4 VDC 12 12 Circuit 1 Suction Temp Circuit 1 Suction Line 40 to 263 F 0 1 F 13 13 Circuit 2...

Страница 57: ...12 12 Spare 13 Condenser Fan M21 14 Condenser Fan M22 15 Spare Reset Options User reset options are located in the Leaving Water Setpoint menu The options are None None is the default value and the le...

Страница 58: ...a McQuay MicroTech control panel CSC or RMS that can provide controlling functions to several McQuay chillers One function is to control the chiller leaving water temperature according to some control...

Страница 59: ...quipment protection control the number of cooling stages will be decreased and always equal to the number of available compressors for operation At all times the second stage of cooling will have a co...

Страница 60: ...seconds off When an alarm of pre alarm condition exists the MicroTech display automatically switches to the alarm menu to alert the user of the condition The MicroTech controller alarms can either be...

Страница 61: ...ndition and the MicroTech display will show the current alarm condition System alarm conditions are Loss of Water Flow Bad Phase Voltage Chilled Water Freeze Protection Volts Ratio Protection Bad Leav...

Страница 62: ...tarted Stage 4 cooling will start the last compressor When the evaporator water temperature is satisfied the reverse will occur with the compressor with the most run hours being stopped in each stage...

Страница 63: ...ndition When power is first applied to the control panel through the circuit breaker CB the red RESET LED will illuminate for approximately 3 seconds During this time the controller is checking the co...

Страница 64: ...ied via separate disconnect if freezing ambient conditions are expected 1 Close the manual liquid line shut off valves Move the circuit 1 and 2 switches to the Pumpdown and Stop position Each operatin...

Страница 65: ...hown on the top line and the current MENU ITEM is shown on the bottom line of the display Either Inch Pound I P or S I units can be displayed by installing the appropriate software I P Units Temperatu...

Страница 66: ...Prev Pressing PREV shifts the display to the previous menu Note When Menu I is currently in the display the first menu in the menu tree structure pressing PREV causes an end of menus message to appear...

Страница 67: ...key four times This changes the menu item entry to 42 F 6 Press the ACTION group ENTER key one time This stores the new entry into the MicroTech controller memory 7 Pressing the CATEGORY group STATUS...

Страница 68: ...eration of the unit Negligent or improper adjustment of these controls can result in damage to the unit or personal injury Menu 13 Control Mode One of several automatic and manual operating modes can...

Страница 69: ...gh our MicroTech Open Protocol Monitor Software The Network reset option allows a signal to be sent reflecting 0 100 reset of the Lvg Evap set point chillers or Lvg Cond set point THRs based on the Ma...

Страница 70: ...ithin this menu The Minimum Lift Pressure is the minimum differential pressure to be maintained across the expansion valve The dead band defines the pressure differential range within which no fan sta...

Страница 71: ...r will be started The Low Pressure cut out set point determines the point at which the compressors will shut off during a pumpdown sequence The Refrigerant Freeze and Water Freeze alarm set points can...

Страница 72: ...Ready PumpingDown OpenSolenoid Capacity Starting LowAmbStart 1 Table 24 MENU 4 Water Temp s Screen Display Lvg Evap xxx x F C Short F C 1 Open F C Ent Evap xxx x F C Short F C 2 Open F C D T Evap Sho...

Страница 73: ...xx F C 1 N A F C SuctLine xxx x F C Open F C 2 Short Super Ht xxx x F C 3 N A F C Satur Cond xxx F C 4 N A F C Liquid Ln xxx x F C 5 N A F C SubCoolg xxx x F C 6 N A F C 7 CondD T F C Table 29 MENU 9...

Страница 74: ...None 8 ResetSig xx xma Not Changeable 9 MaxChWRst xx x F C 10 0 5 5 0 0 45 0 0 0 25 0 10 ReturnSpt xx x F C 54 0 12 3 15 0 80 0 9 4 26 7 the minus sign is not displayed with three digit numbers Table...

Страница 75: ...nLift 50 xxx 80 552 70 100 483 690 3 MinLift100 xxx 140 966 100 140 690 966 4 DeadBandMult x x 1 0 8 1 3 5 StageUpErr xxx 400 2760 300 990 2070 6830 6 StageDnErr xxx 100 690 50 400 340 2760 Table 39 M...

Страница 76: ...n Dec 1 31 12 6 Dur 0 Day s 0 0 31 13 7 Date N A 0 N A 0 Jan Dec 1 31 14 7 Dur 0 Day s 0 0 31 15 8 Date N A 0 N A 0 Jan Dec 1 31 16 8 Dur 0 Day s 0 0 31 17 9 Date N A 0 N A 0 Jan Dec 1 31 18 9 Dur 0 D...

Страница 77: ...T GZ2E01A Table 47 MENU 24 1 Curr Alarm Screen Display 1 Current Alarm 2 0 00 0 00 00 3 Evap x x psi kPa 4 Cond x x psi kPa 5 SuctLine xxx x F C 6 LiquisLn xxx x F C 7 Evap Lvg xxx x F C 8 OAT xx xx F...

Страница 78: ...n cable The ADI board conditions these inputs Analog Inputs Connection The MCB receives conditioned analog inputs from the ADI board through the Analog Inputs connector via a plug in ribbon cable The...

Страница 79: ...ff No power to MCB Off On Self test failure or power supply problem On Off MCB operating normally For longer than 5 seconds Table 52 Amber Status LED Indication Amber LED State Indication Off Normal o...

Страница 80: ...ted via phone lines with a modem Port A can also be used to connect a licensed building automation system to the MicroTech network via Open Protocol The default communications rate is 9600 baud Port B...

Страница 81: ...le levels Use the following procedure to isolate the problem Note that this procedure can require two or three spare MCB fuses Refer to the panel wiring diagram 1 Verify that circuit breaker CB1 is cl...

Страница 82: ...xcessively loading the MCB s 5Vdc power supply Isolate the problem by taking resistance measurements on each of these devices with the wiring disconnected The resistance across the power input termina...

Страница 83: ...C connector pull back the plug about one eighth of an inch and place the test leads against the exposed pins If there is no voltage check the wiring and the connections between the controller s 5Vdc f...

Страница 84: ...MCB If the MCB appears to be functioning properly and the digital input is not being read by the MCB perform the following procedure 1 Try cycling power to the controller by opening and then closing...

Страница 85: ...2 Remove power from the controller Check the ribbon cable and connections between the OB and the MCB Look for bent pins If the cable and connections are intact go to step 3 3 Remove the relay from th...

Страница 86: ...unit operation Restore power by closing CB1 If the output load energizes the suspect relay is bad Replace the relay If the output load does not energize when LED is lit again check the load circuit w...

Страница 87: ...an electromechanical relay If the relay is energized the relay output will be hot If the relay is de energized voltage cannot be measured at the relay output The circuit shown in Figure 33 is similar...

Страница 88: ...No maintenance is ordinarily required except the routine removal of dirt and debris from the outside surface of the fins McQuay recommends the use of foaming coil cleaners available at most air condi...

Страница 89: ...ally inspect unit for loose or damaged components X Inspect thermal insulation for integrity X Clean and paint as required X Electrical Check terminals for tightness tighten as necessary X Clean contr...

Страница 90: ...moisture in the system During the first few months of operation the filter drier replacement can be necessary if the pressure drop across the filter drier exceeds the values listed in the paragraph a...

Страница 91: ...ooling at any steady state condition Subcooling will vary somewhat with evaporator leaving water temperature and suction superheat As the evaporator superheat decreases the subcooling will drop slight...

Страница 92: ...r the filter drier The subcooling values should be between 6 F 20 F 6 6 C 11 1 C The subcooling values will be highest at 75 100 load approximately 12 F 20 F 6 6 C 11 1 C and lowest at 50 load approxi...

Страница 93: ...essure 4 Compressors running in reverse 4 Check for proper phasing 1 Lack of refrigerant 1 Check for leaks Repair and add charge Check liquid sightglass 2 Clogged liquid line filter drier 2 Check pres...

Страница 94: ...94 AGZ 035A through 065A IOMM AGZ 3 Notes...

Страница 95: ......

Страница 96: ...2510 Staunton Virginia 24402 USA 800 432 1342 www mcquay com This document contains the most current product information as of this printing For the most up to date product information please go to ww...

Отзывы: