C o m m i s s i o n i n g
Power Module DN
Version 09.2019
Page 18/43
5
Commissioning
Indicates danger for persons with a cardiac pacemaker.
Installation and commissioning of the device only by skilled personell.
•
Connect only to power source with correctly installed protection conductor
•
Connect with regard to local regulations
Mount device on and flat ground, stable and flat surface.
•
Ensure safe operation of device at all times
•
Operate power module only upright. Do not operate in horizontal position
Connection and disconnection of the coil module only with main switch off.
5.1 Power on
•
After correct installation turn main switch on
•
White lamp
Operation lamp
is lit
•
Green lamp
Ready lamp
is lit
5.2 Trigger demagnetization pulse
•
Trigger pulse by pushing
Start button
•
Machine carries out demagnetisation automatically
•
Yellow lamp
Active lamp
is lit during demagnetization pulse
•
Lamp at the coil is lit Yellow
•
After the pulse the
Active lamp
goes out
•
Check fan (if available)
•
Pulse duration
: ~4…13 second (according to electric circuit diagram)
5.3 Demagnetisation test with intended object
•
Measure residual magnetism according to measurement process definitions
•
Place object in coil
•
Trigger demagnetization pulse
•
Remove object after completion (
Active lamp
goes out) of demagnetization pulse
•
Measure residual magnetism according to measurement process definitions
5.4 Control via interface (if applicable)
•
Readout
Module OK s
ignal
•
Readout
Module Ready
s
ignal
•
Trigger pulse
•
Readout
Active Ready
s
ignal
•
Readout
Analog
Signal
•
Readout
Process OK s
ignal (if applicable)