© Martin Engineering GmbH
15
M3289UK-01/17
Installation
1.
Deactivate the conveyor system and all accessories before
starting the installation work and secure them against
inadvertent reactivation.
2.
Mark the vertical and horizontal centre line of the driving drum
on the operator side of the chute wall to determine the centre
point (B, Fig. 2) of the driving drum. Extend the vertical
centreline to determine the point C.
3.
Mark a position (F, Fig. 2) at a distance from 50 to no more than
200 mm in the conveying direction (A, Fig. 2) from the point at
which the belt leaves the head pulley (C, Fig. 2).
4.
Draw a vertical line at this position (F, Fig. 2) going downwards
at a right angle to the conveyor belt.
5.
Use the dimensions from Figure 2 to mark the installation holes
for the tensioner.
6.
Create the slot-shaped cut-out and installation holes as shown
in Figure 2.
7.
Repeat steps 1 to 6 on the opposite side of the chute wall.