![Marsh PatrionPlus Скачать руководство пользователя страница 61](http://html1.mh-extra.com/html/marsh/patrionplus/patrionplus_technical-manual_1730813061.webp)
Installation
3-20
Data Line Installation
1) Make sure the controller and printhead power supplies are unplugged.
CAUTION: Do not connect a printhead data line while the controller or
printhead power supply is plugged in. Serious damage may result to the
printhead and the controller.
2) Connect a data line to the top (male) connector of your first printhead,
and tighten the two thumbscrews. (See Figure 3M.)
3) Remove and retain the terminator from the Task 1 connector on the
back of the controller.
4) Connect the other end of the data line to the Task 1 connector on the
back of the controller.
5) To serially link the first printhead with the second, connect a data line
to the bottom (female) connector of your first printhead and to the top
(male) connector of your second printhead.
6) Repeat step 5 until all printheads are serially linked.
7) Install the terminator on the unused bottom (female) connector of the
last printhead.
CAUTION: Proper operation cannot be guaranteed if a terminator is not
installed on the unused connector.
8) If you are printing on two conveyors, install the Task 2 key on the
Task 2 connector on the back of the controller.
9) Connect printheads for your second line to the Task 2 printhead
connector on the back of the controller.
10) Connect the terminator included with the Task 2 key to the unused
bottom (female) connector of the last printhead.
Содержание PatrionPlus
Страница 41: ...Installation ii 29669 02080 Rev AF...
Страница 72: ...Operation iv 29669 02080 Rev AG...
Страница 153: ...Maintenance ii 29669 02012 Rev AF...
Страница 161: ...Troubleshooting ii 29669 02080 Rev AF...
Страница 184: ...Repair ii 29669 02080 Rev AF...
Страница 212: ...Parts List ii 29669 02080 Rev AF...