![Maple Systems BLU300 Series Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/maple-systems/blu300-series/blu300-series_installation-and-operation-manual_1724164015.webp)
Do not use the power supply used to provide power to the OIT to power switching relays, solenoids, or other active devices.
4
STEPS:
1. Connect the power cable to the OIT as follows:
A. Strip the power cable shield to expose 2” of the black and red wires.
B. Strip about ¼” of insulation from the black and red wires.
C. Thread the black and red wires through the ferrite core. The shield wire must be outside.
D. Connect the red wire to the DC positive (+) input of the OIT power terminal.
E. Connect the black wire to the DC negative (-) input of the OIT power terminal.
F. Connect the power cable shield wire to the OIT power terminal’s chassis ground input.
2. Route the power cable to the OIT power supply. The power cable should not be any longer than
necessary.
3. Install the power supply wires as follows (with colors shown for Maple Systems cable P/N
6030-0009):
Color
Power Supply
BLU300 Label
Red
+24 V dc
+24V
Black
-24V dc return
0V
Shield
Case ground
0
FG
1010-0300, Rev 02
Installation of OITs
11
+24V
0V
+
-
BLU300 OIT
(rear side)
24Vdc
power supply
Control
panel
Shield wire (bare)
Black wire (-)
Red wire (+)
Ferrite coil
Shield wire runs
outside ferrite coil
120Vac
Black
Shield drain
Red
FG
DC Output -V (Gnd)
DC V (+24V)
OIT Power Inputs
Содержание BLU300 Series
Страница 1: ......
Страница 64: ...1010 0300 Rev 02 62 Blue Series Installation Operation Manual...
Страница 113: ...1010 0300 Rev 02 112 Blue Series Installation Operation Manual...
Страница 138: ...Appendix B Dimensional Outlines Panel Cutout 1010 0300 Rev 02 Dimensional Outlines Panel Cutout 141...