![Manitowoc QC0700 Скачать руководство пользователя страница 88](http://html.mh-extra.com/html/manitowoc/qc0700/qc0700_service-manual_701073088.webp)
Electrical System
Section 6
6-26
Part No. 80-1214-3
Wiring Diagram Sequence of
Operation
QF2300
Initial Start-Up or Start-Up After
Automatic Shut-Off
1A. WATER FLUSH
Immediately after placing the toggle
switch in “ICE”, the dump valve
solenoid, and gearbox are energized.
After 45 seconds the dump valve de-
energizes.
SV2109
RELAY
K1
RELAY
K2
RELAY
K3
RELAY K4
(25)
L1
L2
(54)
(53)
LIQUID LINE
SOLENOID
CENTRIFUGAL
SWITCH
(65)
INTERNAL
OVERLOAD
START
RUN
GEARMOTOR
WATER FLOAT
VALVE
DUMP VALVE
(56)
(55)
(22)
(51)
(52)
7 AMP
FUSE
GROUND
(58)
(57)
EQUALIZATION
SOLENOID
C2
C1
(91)
(22)
1A. Water Flush
(45 Seconds)
Toggle Switch
ICE
Bin Level Probe
Open (No Ice Contact)
Control Board Relays
#1
Liquid Line Solenoid Valve
OFF
#2
Dump Valve
ON
#3
Gear Motor
ON
#4
Water Float Valve Solenoid Coil
OFF
Revised 8/2003
Содержание QC0700
Страница 8: ...Table of Contents continued 6 Part No 80 1214 3 Revised 8 2003 ...
Страница 12: ...General Information Section 1 1 4 Part No 80 1214 3 THIS PAGE INTENTIONALLY LEFT BLANK Revised 8 2003 ...
Страница 30: ...Installation Instructions Section 2 2 18 Part No 80 1214 3 THIS PAGE INTENTIONALLY LEFT BLANK Revised 8 2003 ...
Страница 52: ...Ice Machine Sequence of Operation Section 4 4 4 Part No 80 1214 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 122: ...Electrical System Section 6 6 60 Part No 80 1214 3 THIS PAGE INTENTIONALLY LEFT BLANK Revised 8 2003 ...
Страница 144: ...Refrigeration System Section 7 7 22 Part No 80 1214 3 Using Pinch Off Tool SV1406 Revised 8 2003 ...
Страница 147: ...Revised 8 2003 ...
Страница 150: ...Refrigeration System Section 7 7 26 Part No 80 1214 3 THIS PAGE INTENTIONALLY LEFT BLANK Revised 8 2003 ...