Installation Instructions
Section 2
2-16
Part No. 80-1214-3
Verify O-ring in schrader valve caps are intact and
reinstall on shut off valves to prevent refrigerant leakage.
Replace shut off valve access caps and torque to the
following specifications.
Torque Value’s
Replace cap on receiver service valve and tighten.
Open Receiver Service Valve
There is a liquid line solenoid valve at the outlet of the
receiver; refrigerant will not flow to the condensing unit
until the ice machine head section is started. Connect
power to both the ice machine head section and the
Remote condensing unit. Place the ICE/OFF/CLEAN
toggle switch into the ICE position, this will allow
refrigerant to enter the line set and condensing unit.
Step 7 Leak Check The Refrigeration System
Leak check the new line set connections at the ice
machine head section, condensing unit and S trap as
well as all factory joints throughout the entire system.
Disconnect power to the remote condensing unit. Place
the ICE/OFF/CLEAN toggle switch into the ICE position.
This allows the low side and high side pressures to
equalize. Place the ICE/OFF/CLEAN toggle switch in the
OFF position. Connect power to the remote condensing
unit and allow system to pump down.
Step 8 Insulation Requirements
To prevent condensation the entire suction line including
the shut-off valve must be insulated. All insulation must
be airtight and sealed at both ends.
The following insulation requirements prevent
condensation at 90°F (32.2°C) ambient 70% Relative
Humidity. If higher humidity is expected, increase
insulation thickness.
The entire line set, including the suction service valve
located on the back of the ice machine requires:
Stem
18-20 ft. lbs.
Caps
12-15 ft. lbs.
Schrader Core
1.5-3 in. lbs.
Important
All refrigeration valve caps must be reinstalled to
prevent future refrigeration leaks.
TURN
COUNTERCLOCKWISE
SV1756
RECEIVER SERVICE VALVE CAP
(TURN COUNTERCLOCKWISE
TO REMOVE)
Suction Line
Liquid Line
Min. Insulation
Thickness
3/4 inch
(19.1 mm)
1/2 inch
(12.7 mm)
1/2”(13mm)
Suction Line
1/4” (7mm)
Liquid Line
Important
To prevent condensation the entire suction line
including the shut off valve must be insulated. All
insulation must be airtight and sealed at both ends.
The minimum requirements are for conditions at or
below 70% humidity and 90°F (32.2°C) ambient.
When higher humidity will be experienced, insulation
wall thickness will need to be increased.
Revised 8/2003
Содержание QC0700
Страница 8: ...Table of Contents continued 6 Part No 80 1214 3 Revised 8 2003 ...
Страница 12: ...General Information Section 1 1 4 Part No 80 1214 3 THIS PAGE INTENTIONALLY LEFT BLANK Revised 8 2003 ...
Страница 30: ...Installation Instructions Section 2 2 18 Part No 80 1214 3 THIS PAGE INTENTIONALLY LEFT BLANK Revised 8 2003 ...
Страница 52: ...Ice Machine Sequence of Operation Section 4 4 4 Part No 80 1214 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 122: ...Electrical System Section 6 6 60 Part No 80 1214 3 THIS PAGE INTENTIONALLY LEFT BLANK Revised 8 2003 ...
Страница 144: ...Refrigeration System Section 7 7 22 Part No 80 1214 3 Using Pinch Off Tool SV1406 Revised 8 2003 ...
Страница 147: ...Revised 8 2003 ...
Страница 150: ...Refrigeration System Section 7 7 26 Part No 80 1214 3 THIS PAGE INTENTIONALLY LEFT BLANK Revised 8 2003 ...