Application
Depending on the environment in which a crane is used
and/or stored, initial factory application of Carwell
®
T32
(CP-90) should help inhibit corrosion for approximately
12 months.
It is recommended the treatment be periodically reapplied by
the crane owner, after that time, to help continue protection
against corrosion of the crane and its components.
However, if a crane is used and/or stored in harsh
environments (such as islands, coastal regions, industrial
areas, areas where winter road salt is regularly used, etc.),
reapplication of treatment is recommended sooner than
12 months, for example, repeat treatment in 6 to 9 months.
•
Do not apply to recently primered and painted areas for
at least 48 hours after paint is properly dried and cured.
For minor touch up areas a 24-hour period is needed for
cure time before applying treatment.
NOTE:
The crane must be completely dry before applying
treatment.
•
Do not allow product to puddle or build-up on weather
stripping, rubber gaskets, etc. The crane should not
have puddles or runs evident anywhere.
•
To ensure proper coverage, product needs to be fogged
on the crane.
•
Use of pressure pots to apply treatment is
recommended.
•
Carwell
®
treatment is available in 16-ounce spray
bottles from Manitowoc Crane Care (order part number
8898904099).
•
After treatment application is complete, wash or clean
film residue from lights, windshield, grab handles,
ladders/steps and all crane access areas, as necessary.
Contact your local Grove distributor or Manitowoc Crane
Care should you have any questions.
Areas of Application
Refer to Figure 6-25 and Figure 6-26 for location of crane
components that need periodic application of Carwell
®
T32
(CP-90) for continued protection against corrosion.
•
Underside of crane will have full coverage of the rust
inhibitor. These are the only areas that a full coat of rust
inhibitor is acceptable on painted surfaces. Areas
include; Valves, hose end and fittings, Swivel, pumps,
axles, drive lines, transmission, slew ring fasteners and
all interior surfaces of the frame.
•
Frame application areas are; hose ends and fittings, all
unpainted fasteners and hardware, all bare metal
surfaces, outrigger pads, and back up alarm hardware.
•
Superstructure applications are; hose end and fittings,
wire rope on hoist roller tensioning springs on hoists, all
unpainted fasteners and hardware, valves, slew ring
fasteners and all bare metal surfaces.
•
Boom applications areas are; pivot pins, hose end and
fittings, jib pins and shafts, all bare metal surfaces,
overhaul ball pins/ hook block pins and fasteners.
•
All hardware, clips, pins, hose connections not painted
will have treatment applied.
Содержание Grove GRT8120
Страница 1: ...Operator Manual Grove GRT8120 ...
Страница 4: ...THIS PAGE BLANK ...
Страница 16: ...TABLE OF CONTENTS GRT8120 A 12 THIS PAGE BLANK ...
Страница 24: ...INTRODUCTION GRT8120 OPERATOR MANUAL 1 8 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 74: ...SAFETY INFORMATION GRT8120 OPERATOR MANUAL 2 50 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 182: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 52 Published 3 22 2021 Control 702 02 FIGURE 4 54 ...
Страница 184: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 54 Published 3 22 2021 Control 702 02 FIGURE 4 55 1a 1b 1c 1d 1e 1f ...
Страница 186: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 56 Published 3 22 2021 Control 702 02 FIGURE 4 56 1a 1b 1c 1d 1e 1f 1g ...
Страница 188: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 58 Published 3 22 2021 Control 702 02 FIGURE 4 57 ...
Страница 190: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 60 Published 3 22 2021 Control 702 02 FIGURE 4 58 ...
Страница 221: ...Grove Published 3 22 2021 Control 702 02 4 91 GRT8120 OPERATOR MANUAL OPERATING PROCEDURES 4 THIS PAGE BLANK ...
Страница 378: ...5 70 Published 3 22 2021 Control 702 02 SET UP AND INSTALLATION GRT8120 OPERATOR MANUAL THIS PAGE BLANK ...
Страница 440: ...GRT8120 OPERATOR MANUAL A 10 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 447: ......
Страница 448: ......