![Manitowoc Grove GRT8120 Скачать руководство пользователя страница 236](http://html.mh-extra.com/html/manitowoc/grove-grt8120/grove-grt8120_operators-manual_701202236.webp)
OPERATING PROCEDURES
GRT8120 OPERATOR MANUAL
4-106
Published 3-22-2021, Control # 702-02
Locking the Superstructure
1.
Swing the superstructure to the desired position.
2.
Maintain superstructure position by pressing and
holding the swing brake pedal.
3.
Using the Jog Dial or the Arrow Buttons on the
Navigation Control Pad, select the Lock icon
(2, Figure 4-105).
4.
Press the Jog Dial or the OK Button to start the locking
process.
When the lock is engaged, the Locked Status Indicator
(4, Figure 4-106) will appear.
Unlocking the Superstructure
1.
Press and hold the swing brake pedal.
2.
Using the Jog Dial or the Arrow Buttons on the
Navigation Control Pad, select the Unlock icon
(3, Figure 4-105).
3.
Press the Jog Dial or the OK Button to start the locking
process.
When the lock is disengaged, the Unlock Status
Indicator (4, Figure 4-105) will appear.
Boom Extension Deployment/Stowage
Select the Boom Extension Deployment/Stowage icon
(1, Figure 4-107) under the Crane Function Group to show
the Boom Extension Deployment/Stowage function screen.
The Boom Extension Deployment/Stowage function screen
is used to extend and retract the front and rear boom
extension pins that secure the boom extension to the boom
base section.
Complete procedures for the deployment and stowage of the
boom extension, including the use of the Boom Extension
Deployment/Stowage function screen, are found in the
section titled
FIGURE 4-106
9902-14
4
FIGURE 4-107
10254-3
1
Содержание Grove GRT8120
Страница 1: ...Operator Manual Grove GRT8120 ...
Страница 4: ...THIS PAGE BLANK ...
Страница 16: ...TABLE OF CONTENTS GRT8120 A 12 THIS PAGE BLANK ...
Страница 24: ...INTRODUCTION GRT8120 OPERATOR MANUAL 1 8 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 74: ...SAFETY INFORMATION GRT8120 OPERATOR MANUAL 2 50 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 182: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 52 Published 3 22 2021 Control 702 02 FIGURE 4 54 ...
Страница 184: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 54 Published 3 22 2021 Control 702 02 FIGURE 4 55 1a 1b 1c 1d 1e 1f ...
Страница 186: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 56 Published 3 22 2021 Control 702 02 FIGURE 4 56 1a 1b 1c 1d 1e 1f 1g ...
Страница 188: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 58 Published 3 22 2021 Control 702 02 FIGURE 4 57 ...
Страница 190: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 60 Published 3 22 2021 Control 702 02 FIGURE 4 58 ...
Страница 221: ...Grove Published 3 22 2021 Control 702 02 4 91 GRT8120 OPERATOR MANUAL OPERATING PROCEDURES 4 THIS PAGE BLANK ...
Страница 378: ...5 70 Published 3 22 2021 Control 702 02 SET UP AND INSTALLATION GRT8120 OPERATOR MANUAL THIS PAGE BLANK ...
Страница 440: ...GRT8120 OPERATOR MANUAL A 10 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 447: ......
Страница 448: ......