1 - 21
T
YRES
- Make sure that the wheel nuts are correctly tightened (See chapter : SERVICING SCHEDULE - B EVERY 3 MONTHS
OR EVERY 150 WORKING HOURS SERVICE)
F
UEL SYSTEM
- Check that all fuel lines are secured.
- If necessary drain the fuel filter and bleed the fuel system of air.
E
LECTRICAL CIRCUIT
- Check the level and the density of the electrolyte in the battery.
- Check the components of the electrical system, the connections and fastening devices.
IF NECESSARY, CONSULT YOUR DEALER.
Содержание 160 ATJ
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...1 1 1 OPERATING AND SAFETY INSTRUCTIONS 1 OPERATING AND SAFETY INSTRUCTIONS...
Страница 8: ......
Страница 25: ...1 19 REAR AXLE ASSEMBLY FIG E Axle type Serial Nr Maker s N E...
Страница 28: ...1 22...
Страница 29: ...2 1 2 DESCRIPTION 2 DESCRIPTION...
Страница 30: ......
Страница 31: ...2 3...
Страница 37: ...2 9...
Страница 39: ...2 11...
Страница 41: ......
Страница 74: ...2 46 MAIN DISTRIBUTOR Basket rotation Turret rotation Steering Pendular arm Tilt compensation...
Страница 75: ...3 MAINTENANCE 3 MAINTENANCE...
Страница 76: ......
Страница 78: ......
Страница 105: ...3 31...
Страница 107: ...3 33 G3 2 Centre of gravity Platform s total weight 8090 Kg...
Страница 111: ...4 ELECTRICITY 4 ELECTRICITY 4 1...
Страница 112: ...4 2...
Страница 114: ...4 4...
Страница 115: ...5 1 5 OPTIONAL ACCESSORIES FOR THE RANGE 5 OPTIONAL ACCESSORIES FOR THE RANGE...
Страница 116: ...5 2...
Страница 119: ...5 5 180 ATJ 20 Wide basket option A 7800 A1 5795 C 2413 C1 2595 D 2300 E 460 F 360 N 50 20 Wheels Wide basket 2 10 m...
Страница 120: ...5 6...
Страница 121: ...6 1 6 MAINTENANCE HANDBOOK 6 MAINTENANCE HANDBOOK...
Страница 122: ......
Страница 130: ......
Страница 131: ...Powered by TCPDF www tcpdf org...