Page 35
3.8.7.
51B
Continuation of Installation - Trim Switch Control Model
1. Unpack the battery pack and connect to
the battery connection on the cable.
2. Fit the connectors on the cable to the
drive motor ensuring correct polarity. The
cable connectors must be matched to
the appropriately sized spade connector.
3. Test the operation of the drive motor
using the trim switches (
X
2.1.4
X
-
X
Lighting
Procedure (Optimum Control and
Trim Switch Control)
X
on
page
X
9
X
).
4. Proceed
to
Section
X
3.8.9
X
to commission
the appliance.
4xAA
BATTERIES
Figure 53
3.8.8.
52B
Continuation of Installation - Total Control
1. Unpack the box containing the receiver
and hand set.
2. Pull out the four cables through the heat
shield and connect them as shown in
X
Figure 54
X
.
3. Insert the four AA batteries in the
receiver ensuring correct polarity.
4. Replace the receiver within the heat
shield ensuring that the cables are not
touching the underside of the tray.
5. Insert the PP3 (9V) battery in the hand
set.
6. Proceed
to
Section
X
3.8.9
X
to commission
the appliance.
HT
Lead
SW
)
(yellow
TC
(
)
red
Valve
Cable
Figure 54
Содержание ARIA
Страница 8: ...Page 4 This page is left intentionally blank...
Страница 28: ...Page 24 This page is left intentionally blank...
Страница 42: ...Page 38 This page is left intentionally blank...
Страница 53: ...Page 49 This page is left intentionally blank...
Страница 54: ...Page 50 This page is left intentionally blank...
Страница 55: ...Page 51 This page is left intentionally blank...