![background image](http://html1.mh-extra.com/html/macdon/r113-sp/r113-sp_operators-manual_3435729152.webp)
215009
138
Revision A
1021850
A
B
B
C
Figure 4.81: Vertical Shield
5.
Remove one M10 x 20 hex flange head bolt (A), two
M10 x 16 hex flange head bolts (B), and vertical shield (C).
1011136
A
B
Figure 4.82: Drum Shields
6.
Remove eight M8 hex flange head bolts (A), and remove
two drum shields (B).
1011137
A
A
B
C
Figure 4.83: Hub Drive and Driveline Assembly
7.
Remove four M12 hex flange head bolts (A) and spacers
securing driveline assembly (B) to hub drive (C).
Содержание R113 SP
Страница 3: ...Declaration of Conformity Figure 1 EC Declaration of Conformity 1029750 215009 i Revision A...
Страница 4: ...Figure 2 EC Declaration of Conformity 1029751 215009 ii Revision A...
Страница 14: ......
Страница 210: ......
Страница 214: ......
Страница 222: ......
Страница 232: ......
Страница 238: ......