![MacDon FD75 Скачать руководство пользователя страница 513](http://html.mh-extra.com/html/macdon/fd75/fd75_operators-manual_685691513.webp)
214323
495
Revision B
Installing Double-Reel U-Joint
Once the old U-joint has been removed, a new one can be installed.
NOTE:
It may be necessary to move the right reel sideways for the U-joint to clear the reel tube.
1001325
A
B
C
Figure 6.302: U-Joint
1.
Position U-joint flange (B) onto driven sprocket (C) as
shown. Install six bolts (A) and hand-tighten them.
NOTE:
Do
NOT
torque the bolts.
1001322
A
B
Figure 6.303: U-Joint
2.
Position the right reel tube against the reel drive and
engage the stub shaft into the U-joint pilot hole.
3.
Rotate the reel until the holes in the end of the reel tube
and U-joint flange (B) line up.
4.
Apply medium-strength threadlocker (Loctite
®
243 or
equivalent) to four 1/2 in. bolts (A) and secure them with
lock washers.
5.
Torque the bolts to 102
–
115 Nm (75
–
85 lbf
∙
ft).
1013936
A
Figure 6.304: Supporting Reel
6.
Remove temporary reel support (A).
7.
Install the drive cover. For instructions, refer to
.
Содержание FD75
Страница 8: ......
Страница 43: ...214323 25 Revision B Figure 2 1 Header Width 1018123 A B PRODUCT OVERVIEW ...
Страница 71: ...214323 53 Revision B For more information refer to Table 3 4 page 51 OPERATION ...
Страница 306: ......
Страница 360: ......
Страница 524: ......
Страница 538: ......