...........................................................................................................................................................................................................................................................
Operational Tests
Automatic Protection Switching and Alarm Test
5 - 1 0
Lucent Technologies - Proprietary
See notice on first page
365-372-327 R2.0
Issue 1, October 2003
MAIN OLIU Switching Test
Use this procedure to test the following Main OLIU circuit packs:
LNW40, LNW38, or LNW51(R1.1)
Step 1
Establish a CIT session by following the procedure under Use of
WaveStar™ CIT Software (page 3-8) in Chapter 3, Software Download
and Circuit Pack Installation. Use the scroll bar in the
Command
Builder
window to scroll down to the
rtrv-crs-sts1
command.
............................................................................................................................................................................
Step 2
Click on the
rtrv-crs-sts1
command with
m{1}-1-{1}
for a parameter
value. If there is no cross connect remaining from the previous section,
then a cross connection must be established before continuing.
............................................................................................................................................................................
Step 3
Click on the ent-crs-sts1 command.
............................................................................................................................................................................
Step 4
Under the
Parameters
section,
<STS1CRSSRC>,
click on
m-1-{1}
.
............................................................................................................................................................................
Step 5
Under the
Parameters
section,
<STS1CRSDST>,
Click on
{a}-{1}
.
Double click on
a
and choose the Function Group where the LNW6/
LNW7 (28DS1), LNW16 (12DS3/EC1) or LNW39 (DS1/DS3/16/3)
circuit pack is installed.
Result:
A command similar to the following example should be
displayed in the command window to the left of the
Send
button
Example for Function Group A:
ent-crs-sts1:
LT-DMXTEND
:m-1-1,a-1:1::2WAYPR;
This command creates a cross-connect to map all 28 DS1s of a
28DS1circuit pack or the first DS-3 of a 12DS3/EC1 for Function Unit
D or G or all 16 DS1s of the LNW39 circuit pack in Function Unit A-1
and/or A-2 slot(s) to the first STS-1 of the Main OLIUs.
............................................................................................................................................................................
Step 6
Click
Send
to issue the command.
Result:
The Response Window should display the command
followed by a
COMPLD
indication.