Lucent Technologies 415B Battery Plant for 4ESS
4 - 2 System Installation
Issue 6 September 1999
General
Installation
Mounting
Brackets on
Control and
Distribution Bay
Mount the top bracket in Positions 75-73. Mount the bottom in
Positions 5-3. See Figure 4-1.
Note
Install top and bottom door mounting brackets before
running the cables to the Control and Distribution Bay bus
bars.
Figure 4-1: Bracket Mounting Locations
Positions 75 - 73
Positions 5 - 3