t
t
h
h
e
e
r
r
m
m
o
o
c
c
o
o
m
m
f
f
o
o
r
r
t
t
P
P
N
N
A
A
1
1
5
5
/
/
2
2
0
0
/
/
2
2
5
5
/
/
3
3
0
0
Lohberger Heiztechnik
GmbH
Operating Instructions
N29/HB/GB
page 37
Lohberger Heiztechnik GmbH, A-5020 Salzburg-Bergheim, Rechtes Salzachufer 40
Tel. 0662-450444-0, Fax-DW 9
Es gelten unsere aktuellen allgemeinen Geschäftsbedingungen. Irrtum, Druckfehler und technische Änderungen vorbehalten
7.4
Menu item „Customerservice“
Out/Input Test Heating:
The Out/Input tests serve to check the outputs (pumps, mixers, other drives) and inputs
(temperatures: boiler temperature, buffer temperature, ...).
On trial, each output (drive) can be activated manually and each input can be read.
Buttons
: select next entry; each output has several
corresponding inputs. I.e. with every pushing of buttons
or
either the next output (in line 2) or the next input (in line
4) shows up.
With button
, the drive shown in line 2 is switched on. The button icon on top right of line 2
switches to 1 – drive is running. With the next pushing of the button, the drive switches off.
In line 4, the inputs only can be read.
Out/Input Test Boiler:
The out/input test "boiler" is to operated in the same way.
Additionally, there is the option to set a set position for some
drives (e.g. air flaps). For this purpose, the requested value has
to be entered in the last line next to "Setv(%)". Once the button
has been pushed, the flap goes into the set position and
stops automatically.