
t
t
h
h
e
e
r
r
m
m
o
o
c
c
o
o
m
m
f
f
o
o
r
r
t
t
P
P
N
N
A
A
1
1
5
5
/
/
2
2
0
0
/
/
2
2
5
5
/
/
3
3
0
0
Lohberger Heiztechnik
GmbH
Operating Instructions
N29/HB/GB
page 41
Lohberger Heiztechnik GmbH, A-5020 Salzburg-Bergheim, Rechtes Salzachufer 40
Tel. 0662-450444-0, Fax-DW 9
Es gelten unsere aktuellen allgemeinen Geschäftsbedingungen. Irrtum, Druckfehler und technische Änderungen vorbehalten
If door is open, it can also be deleted immediately (see point 8).
INFO 13 "Pelletburner STARTING!"
Displayed for approx. 2s during "Pellets – Starting" and at the end of the "Tilting" phase.
WHAT TO DO? Nothing.
INFO 14 "Grate Cleaning active !"
Displayed for some seconds while pellets grate is tilted multiple times during cleaning.
WHAT TO DO? Nothing.
INFO 15 "Pelletburner STOPPING!"
Displayed for approx. 2s at the start of "Pellets – Stopping" phase.
WHAT TO DO? Nothing.
INFO 16 "Logoperation STARTING!" – not for PNA
Displayed for approx. 2s at the and of the "Logs – Starting" phase.
WHAT TO DO? Nothing.
INFO 17 "Logoperation STOPPING!" - not for PNA
Displayed for approx. 2s at the and of the "Logs – Stopping" phase.
WHAT TO DO? Nothing.
INFO 18 "Request for boiler service!"
Displayed if the "Service request" function is set to "ON" in the "Basic setting 16of17" menu frame
and the amount of operation hours has reached a set threshold; see section "Service request".
INFO 19 "Stoping after logs burnt out completely" - not for PNA
Displayed if during logs operation the burner switch is set to "OFF" during phases "Starting",
"Working", and "Stopping".
WHAT TO DO? Nothing.
INFO 20 "Pelletstart locked, waiting for pellet refill!"
Displays that it is being waited for the pellet hopper refill.
In detail: If the pellet hopper is enpty between insertion times, usually the refill process also starts
outside refill times. In the "night core time" (0-5h), the insertion is blocked entirely – i.e. this Info is
displayed.
WHAT TO DO?
If pellet-refill outside refill times occurr often and this is perceived as annoying, try to adjust the 4
insertion times better – a 6-hour interval between insertion times is ideal.
INFO 21 "Maximum log loading: TOP EDGE COMB.CHAMBER CONCRETE (Hardwood)" – not for PNA
Displayed after opening of door when the heating's energy input is limited (e.g. because buffer is
fully-loaded).
WHAT TO DO? Follow the report content – "Combustion chamber concrete" is the gray concrete
visible at the bottom of the logs filling chamber; if softwood is used (spruce, fir, alder), approx. 1.5
times the amount can be inserted.
INFO 22 "Maximum log loading: BOTTOM EDGE FILLINGDOOR (Hardwood)" – not for PNA
Displayed after opening of door when the heating's energy input is limited (e.g. because buffer is
fully-loaded).
WHAT TO DO? Follow the report content – if softwood is used (spruce, fir, alder), approx. 1.5 times
the amount can be inserted.
INFO 23 "Maximum log loading: MIDDLE FILLING DOOR (Hardwood)" – not for PNA
Displayed after opening of door when the heating's energy input is limited (e.g. because buffer is
fully-loaded).
WHAT TO DO? Follow the report content – if softwood is used (spruce, fir, alder), approx. 1.5 times
the amount can be inserted.