Cassius Vertical Radiator Fixing Instructions
Please unpack your delivery carefully and inspect the radiator and contents
–
any damages or shortages must be notified to your supplier within 3 days of
delivery of your goods.
SPECIFICATIONS FOR CASSIUS VERTICAL
Materials
Mild Steel
Connections
½
“Flow and
Return
Test Pressure
8 Bar
Testing Authority
EN442
Max operation pressure
4 Bar
Max working temperature 95c
These can be cleaned using a soft damp cloth
with a non-abrasive cleaning product.
PLEASE NOTE: That in accordance with Part L1 2006 of the Building Regulations and BS7593:1992 code of practice for the
treatment of hot water and central heating systems, we recommend flushing the heating system before installation of new
radiators and then adding the correct quantity and type of inhibitor for use with the radiator and system to prevent corrosion.
Damage caused to systems not protected by a suitable inhibitor will not be covered by the manufacturer warranty. It is the
responsibility of the installer to ensure the correct use and suitability of the fixings provided. No liability for costs or damages
arising from failure to do so can be accepted.
Содержание Cassius
Страница 2: ......
Страница 8: ...7 INSTALLATION PROCEDURE ...