background image

16

17

Neptune Adapter

Neptune Coupling

Brooks Adapter

Smith Adapter

LCR-II with LPG 

Meter System

lCr-II MounTInG

Mounting overview

Typically, the LectroCount LCR-II is mounted directly 

onto a flow meter; however, some fixed installations 

require the register be mounted away from the meter. 

If the meter is equipped with an external POD pulser, 

the LCR-II can be mounted up to 1000 wire feet (304 

meters) away from the meter (actual distance depends 

on pulser specifications and wire type). 

Adapters are available for other PD meters such as 

Neptune (PNs 81364, 82641, 82642), FMC Smith (PN 

81370), and Brooks/Brodie (PN 81800) meters. Each kit 

includes installation instructions. 

Tips for mounting an lCr-II:

•   Leave the cover assembly fastened to the base to protect 

the internal components.

• 

Make sure the vertical drive shaft from the meter is 

attached to the pulser drive shafts.

•   Before securing the LCR-II to the meter or mounting 

bracket, make sure the counter is visible and the keypad 

and selector switch can be easily operated.

relieving Internal Pressure

All internal pressure must be relieved to zero pressure before disassembly or inspection of the strainer, vapor eliminator, any 

valves in the system, the packing gland, and the front or rear covers.

!

 WarnInG

relieving Internal Pressure Procedure for lPG and nH

3

 Meters

6.  Slowly crack the fitting on top of the differential valve to 

relieve product pressure in the system.  Product will drain 

from the meter system.

7.   As product is bleeding from the differential valve, slowly 

reopen and close the valve/nozzle on the discharge line. 

Repeat this step until the product stops draining from the 

differential valve and discharge line valve/nozzle.

8.   Leave the discharge line valve/nozzle open while working 

on the system.

1.   Close the belly valve of the supply tank.
2.   Close the valve on the vapor return line.
3.   Close the manual valve in the supply line on the inlet 

side of the meter.  If no manual valve exists on the inlet 

side, consult the truck manufacturer for procedures to 

depressurize the system.

4.   Slowly open the valve/nozzle at the end of the supply 

line.

5.   After product has bled off, close the valve/nozzle at the 

end of the supply line.

Serious injury or death from fire or explosion could result in performing maintenance on an 

improperly depressurized and evacuated system. 

lCr-II MounTInG

LC Meter

O-Ring

Lower register

and bolt down

Insert cotter

pin

Place shaft

adapter on

drive shaft

LectroCount LCR-II

Gallons

LCR-II Bolt Pattern

LC Meter Compensated

LC Meter

Mounting bolt Pattern

The LectroCount LCR-II base casting contains eight bolt 

holes in an industry standard bolt pattern. The holes are 

½" deep and take ¼"-20 screws.

If the installation necessitates that you fabricate a 

bracket, refer to the drawing to the right. 

lC Meters

remove existing registration equipment

1.  Depressurize the meter completely. 

See Warning on pg. 

14.

2.  Remove the four bolts on the bottom that fasten the 

register to the meter. 

3.  Remove the adjuster from the meter. 
4.  If the meter has a Temperature Volume Compensator 

(TVC), remove it as well.

Mount the lectroCount lCr-II

1.  Place the end of the shaft adapter on the pulser drive 

shaft located on the bottom of the register. 

2.  Place the cotter pin through the hole, and bend open the 

ends of the cotter pin. 

3.  Lower the register onto the meter, and insert the shaft 

adapter onto the hex shaft on the meter. 

4.  Securely bolt down the register.

Apply anti-seize to all bolt threads to ensure 

easy removal at a later date.

Apply Anti-seize

Содержание LectroCount LCR-II E3657 Series

Страница 1: ...LectroCount LCR II Installation Liquid Controls An IDEX Energy Fuels Business Operation EM150 21 E3657 E3658 Series LectroCount LCR II SELECT INCREASE Gallons S3...

Страница 2: ...se 2 ou une alimentation lectrique isol e et comportant un dispositif de protection contre la surtension de 5 amp res ou moins sont requises pour l installation Peripheral equipment must be suitable f...

Страница 3: ...a known good ground less than 1 Use a 12 ga or larger stranded wire Fixed Installations LectroCount housings directly mounted to the meter are attached to the earth ground through the meter via the ta...

Страница 4: ...ower cable Specifications Safety Tag Markings EU Explosive Atmospheres symbol This equipment has been found to comply with the European Directive for Equipment For Potentially Explosive Atmospheres 94...

Страница 5: ...8 Dimensions Side Front Top 15 9 94 5 19 LectroCount LCR II 13 7 5 8 04 10 5 70 Rear...

Страница 6: ...ghts Measures custody transfer product delivery and ticket generation Metrological data collection Presetting by volume Multiple production selection Security settings Air and vapor elimination with p...

Страница 7: ...y standard for many applications Multi layered tickets are available to provide a physical record for both customers and business records The Epson roll printer is ideal for recording multiple custody...

Страница 8: ...xidation from the ground strap contact point Lock washers should penetrate any paint to ensure a good electrical connection Ensure a Good Ground LectroCount Ground Strap Kit 82185 Install the LectroCo...

Страница 9: ...nd discharge line valve nozzle 8 Leave the discharge line valve nozzle open while working on the system 1 Close the belly valve of the supply tank 2 Close the valve on the vapor return line 3 Close th...

Страница 10: ...es Data and Power Cable The LCR II shipment typically includes a gray 40 power cable and a 40 black data cable prewired to terminal blocks on the LCR II CPU board On typical truck installations the ca...

Страница 11: ...Preset Valve Single Stage Electro Pnuematic Valve with V 7 Valve S1 Solenoid V 7 Valve Electro Pnuematic Actuator LectroCount LCR II Gallons A2859 11 Block Valve and 3 Way Solenoid Single Stage 3 Way...

Страница 12: ...eries Electro Pnuematic Valve Electro pnuematic valves use a S1 solenoid operated valve mounted to a pneumatic actuator to open and close a V 7 valve These valves are typically used in high viscosity...

Страница 13: ...llations When ordered as part of a meter system with a LCR II Liquid Control s optical air and vapor eliminators are bolted onto the strainer and wired to the LCR II at the factory Optical air and vap...

Страница 14: ...d PN 81944 that mounts directly to the LCR II CPU board Typically a P transducer operates in conjuction with a shutdown device such as a valve or a dead man The shutdown control must be wired to the L...

Страница 15: ...llation J1 RS 232 A Liquid Controls meter system with a LCR II typically includes an Epson slip printer or roll printer Installation is the same for both printers LCR II s are typically shipped with a...

Страница 16: ...ng Device B RS 485 J2 24 red J2 25 violet Multimeter Network B RS 485 J2 24 red J2 25 violet Power Installation Power Installation Overview When you have made all of the data connections and finished...

Страница 17: ...r the LCR II has been installed check to make sure that it powers up correctly The LCR II display and the printer power light should come on when the truck s ignition is turned to the ON or to the ACC...

Страница 18: ...er provided and held in place with the cotter pin provided The control switch on the front of the LCR II is also sealed with an O ring and held in place by a bushing secured with three socket head cap...

Страница 19: ...sher 2 81994 PULSER 100 PPR Pulser Field Install Kit 82597 08189 Flat Washer 08201 O ring 2 Optional Items not shown Description Part Number Roll Printer Extension Cable 71237 Flash Cable 81885 Lap Pa...

Страница 20: ......

Страница 21: ...2014 Liquid Controls Pub No 500392 7 14 105 Albrecht Drive Lake Bluff IL 60044 2242 1 800 458 5262 847 295 1050 Fax 847 295 1057 www lcmeter com...

Отзывы: