background image

18

19

lCr-II MounTInG

Neptune Meter Compensated

Insert cotter

pin

Insert cotter

pin

Bolt plate

and flange

to register

Place adapter

on drive

shaft

Bolt flange

to meter

Place fork

and extension

on end of 

adapter

LectroCount LCR-II

Gallons

Neptune Meter

Insert cotter

pin

Bolt down

bracket to 

meter

Place fork 

and extension 

on drive shaft

Lower register

and bolt onto

bracket

LectroCount LCR-II

Gallons

Neptune Meter

Neptune Meter

Neptune Meter 

with Temperature 

Compensation

Neptune Drive Shaft 

Extension

neptune Meters

remove existing registration equipment

1.  Depressurize the meter completely. 

See Warning on pg. 

10.

2.  Remove the mechanical register from the meter.
3.  Leave the star-shaped gear and the two square-head 

studs. 

4.  Remove the bellows from the front of the meter. 
5.  Remove the compensator. 

Mount the lectroCount lCr-II

1.  Install the drive fork and extension piece (pictured below) 

on the pulser drive shaft located on the bottom of the 

LCR-II. 

2.  Install the bracket on the meter, and fasten with the bolts 

provided in the kit. 

3.  Lower the LCR-II on to the bracket, and securely fasten 

using the four bolts (¼" x ¾") provided.

Mount the lectroCount lCr-II 

onto previously 

temperature compensated Neptune meters

1.  Place the shaft adapter on the pulser drive shaft under 

the LCR-II.

2.  Place the cotter pin through the hole, and bend open the 

ends of the cotter pin.  

3.  Pass the other end of the shaft adapter through the 

flange assembly and the weather plate.

4.  Loosely bolt to register. 
5.   Place the drive fork and extension piece on the shaft 

using two more cotter pins. 

6.  Bolt the flange to the meter and tighten all bolts.

Installation kits 82641 (E-26 series) & 82642 (E-36 

series) are specifically designed for previously temperature 

compensated Neptune meters. 

Apply anti-seize to all bolt threads to ensure 

easy removal at a later date.

Apply Anti-seize

When the register is lowered onto a Neptune meter, make sure 

the drive fork is not pressed against the star gear on the meter. 

There must be a small gap between these two parts. To lower 

the star gear, loosen the set screw on the side of the star gear. 

Failure to do so will eventually damage the internal pulser and/

or the meter gear train.

Star Gear and Drive Fork

Neptune Meter 

with Temperature 

Compensation

rouTInG lCr-II daTa and PoWer Cables

data and Power Cable

The LCR-II shipment typically includes a gray 40' power 

cable and a 40' black data cable prewired to terminal 

blocks on the LCR-II CPU board. On typical truck 

installations, the cables must be routed from the back 

of the truck, where the LCR-II is installed, to the front of 

the truck, where the accessory panel is and the printer 

is typically installed. The black data cable connects 

to the printer, typically mounted in the truck cab. The 

gray power cable hooks up to a power source. During 

installation, follow these guidelines and ensure the 

cables remain undamaged.

Guidelines for routing the data and power cables 

on the outside of the truck

• 

LC recommends that both cables be run through ¾" 

automotive plastic corrugated split loom or through 

flexible liquid-tight conduit for protection.

• 

Make sure the loom or conduit runs down the inside edge 

of the trucks frame rail and fasten every 2' with cable ties.

• 

Install rubber grommets to protect the cables where they 

pass through the cab wall, meter box, etc.

• 

Keep the cables away from heat sources such as the 

engine exhaust, manifold, exhaust pipe, mufflers, etc.

• 

If the cable glands are removed from the register, apply 

pipe sealant or PTFE tape on the gland threads before 

re-installing.

• 

Keep cables away from moving suspension components 

and other moving truck components.

• 

If the cables are shortened, make sure you use the 

proper tool for stripping off the insulation on the cables. 

• 

Make sure cables are connected to the proper terminal.

Instructions for hooking up 

power to the printer and the 

LCR-II begin on pg. 29.

Guidelines for routing the data and power cables 

inside the cab

• 

Layout positions for the component and pathways for the 

cables before beginning.

• 

Make sure the printer and the wires will not obstruct other 

vehicle components.

•   Keep cable pathways away from heavy traffic areas and 

locations where they may be vulnerable to damage.

• 

Remember to save room around the components so 

cables can be easily connected.

• 

Avoid installing the cable where it will be exposed to 

excessive flexing.

• 

Make sure cables are not pulled too tight in areas that will 

move. For example, when wiring cab-over trucks, leave 

enough slack so the cab can be tilted without damaging 

the cable.

• 

Make sure cables are not fastened to adjustable seats.

routing lCr-II data and Power Cables

ETVC Kit

Solenoid

Valve

LectroCount

LCR-II 

Conduit or

Split

Printer 

Data Cable

Printer

Printer 

Power Cable

LCR-II 

Power Cable

Fuse Panel 

(Accessory)

In-Line Fuse

Содержание LectroCount LCR-II E3657 Series

Страница 1: ...LectroCount LCR II Installation Liquid Controls An IDEX Energy Fuels Business Operation EM150 21 E3657 E3658 Series LectroCount LCR II SELECT INCREASE Gallons S3...

Страница 2: ...se 2 ou une alimentation lectrique isol e et comportant un dispositif de protection contre la surtension de 5 amp res ou moins sont requises pour l installation Peripheral equipment must be suitable f...

Страница 3: ...a known good ground less than 1 Use a 12 ga or larger stranded wire Fixed Installations LectroCount housings directly mounted to the meter are attached to the earth ground through the meter via the ta...

Страница 4: ...ower cable Specifications Safety Tag Markings EU Explosive Atmospheres symbol This equipment has been found to comply with the European Directive for Equipment For Potentially Explosive Atmospheres 94...

Страница 5: ...8 Dimensions Side Front Top 15 9 94 5 19 LectroCount LCR II 13 7 5 8 04 10 5 70 Rear...

Страница 6: ...ghts Measures custody transfer product delivery and ticket generation Metrological data collection Presetting by volume Multiple production selection Security settings Air and vapor elimination with p...

Страница 7: ...y standard for many applications Multi layered tickets are available to provide a physical record for both customers and business records The Epson roll printer is ideal for recording multiple custody...

Страница 8: ...xidation from the ground strap contact point Lock washers should penetrate any paint to ensure a good electrical connection Ensure a Good Ground LectroCount Ground Strap Kit 82185 Install the LectroCo...

Страница 9: ...nd discharge line valve nozzle 8 Leave the discharge line valve nozzle open while working on the system 1 Close the belly valve of the supply tank 2 Close the valve on the vapor return line 3 Close th...

Страница 10: ...es Data and Power Cable The LCR II shipment typically includes a gray 40 power cable and a 40 black data cable prewired to terminal blocks on the LCR II CPU board On typical truck installations the ca...

Страница 11: ...Preset Valve Single Stage Electro Pnuematic Valve with V 7 Valve S1 Solenoid V 7 Valve Electro Pnuematic Actuator LectroCount LCR II Gallons A2859 11 Block Valve and 3 Way Solenoid Single Stage 3 Way...

Страница 12: ...eries Electro Pnuematic Valve Electro pnuematic valves use a S1 solenoid operated valve mounted to a pneumatic actuator to open and close a V 7 valve These valves are typically used in high viscosity...

Страница 13: ...llations When ordered as part of a meter system with a LCR II Liquid Control s optical air and vapor eliminators are bolted onto the strainer and wired to the LCR II at the factory Optical air and vap...

Страница 14: ...d PN 81944 that mounts directly to the LCR II CPU board Typically a P transducer operates in conjuction with a shutdown device such as a valve or a dead man The shutdown control must be wired to the L...

Страница 15: ...llation J1 RS 232 A Liquid Controls meter system with a LCR II typically includes an Epson slip printer or roll printer Installation is the same for both printers LCR II s are typically shipped with a...

Страница 16: ...ng Device B RS 485 J2 24 red J2 25 violet Multimeter Network B RS 485 J2 24 red J2 25 violet Power Installation Power Installation Overview When you have made all of the data connections and finished...

Страница 17: ...r the LCR II has been installed check to make sure that it powers up correctly The LCR II display and the printer power light should come on when the truck s ignition is turned to the ON or to the ACC...

Страница 18: ...er provided and held in place with the cotter pin provided The control switch on the front of the LCR II is also sealed with an O ring and held in place by a bushing secured with three socket head cap...

Страница 19: ...sher 2 81994 PULSER 100 PPR Pulser Field Install Kit 82597 08189 Flat Washer 08201 O ring 2 Optional Items not shown Description Part Number Roll Printer Extension Cable 71237 Flash Cable 81885 Lap Pa...

Страница 20: ......

Страница 21: ...2014 Liquid Controls Pub No 500392 7 14 105 Albrecht Drive Lake Bluff IL 60044 2242 1 800 458 5262 847 295 1050 Fax 847 295 1057 www lcmeter com...

Отзывы: