reMoTe dIsPlay and auxIlIary ouTPuTs 

auxiliary outputs

The LCR-II provides three open drain transistor auxiliary 

outputs for different external devices such as pump 

controls and additive injectors. The schematic to the right 

identifies the J13 terminals where the auxiliary outputs 

can be connected to the LCR-II.

Auxiliary Output 1 (Out 1) 

This signal has four output settings: Off, On, On During 

Delivery, and Monitor Flowrate.

Auxiliary Output 2 (Out 2)

This signal has three output settings: Off, On, On During 

Delivery, and Flow Direction. 

Pulse Output (Out 3)

This output represents the gross delivery quantity for 

uncompensated deliveries or the net delivery quantity 

(for compensated deliveries). This output is a real time 

50/50 duty cycle representing the least significant digit of 

the LCR-II totalizers.

auxiliary outputs 4 & 5 

(lectroCount remote display)

Auxiliary ouputs 4 & 5 are typically used for the 

LectroCount Remote Display, but they can also be used 

with other types of displays. Signals from these outputs 

duplicate the volume data sent to the LCR-II display. 

Refer to the LectroCount remote display manual for 

complete installation instructions. 

To wire an external display to the lCr-II:

1.   Attach cable glands and/or conduit connectors to the 

display and the LCR-II port(s). 

2.  Thread the wires through a piece of weatherproof conduit 

cut-to-length from the display port to a LCR-II port. 

3.  Run the weatherproof conduit between the display and 

the LCR-II housing, pull the wires through the ports, and 

tighten the connectors. 

4.  Connect the four display terminals to four terminals on 

the J18 terminal block of the LCR-II CPU board. 

 

•  Remote display terminal 20 to LCR-II terminal 45

 

•  Remote display terminal 21 to LCR-II terminal 39

 

•  Remote display terminal 22 to LCR-II terminal 40

 

•  Remote display terminal 23 to LCR-II terminal 41

To select the Auxiliary Output settings, refer to  the 

LectroCount LCR-II Setup and Operation manual.

Remote Display

GND/

Blac

k

 (41)

DN/

Green

 (40)

+V

o/

Re

d

 (45)

UP/

White 

(39)

Auxiliary Output 1

 (Out 1)

Auxiliary Output 2

 (Out 2)

Pulse Output

 (Out 3)

Disconnect the power before working on the CPU board.

Disconnect Power

Printer Installation (j1 rs-232)

A Liquid Controls meter system with a LCR-II typically 

includes an Epson slip printer or roll printer. Installation 

is the same for both printers. 

LCR-II’s are typically shipped with a black-sheathed data 

cable prewired to terminals J1 and J3 on the LCR-II CPU 

board.

To install the printer:

1.  Find a convenient mounting spot in the truck cab where 

drivers can easily operate the printer.

2.   Clean the mounting spot and the bottom of the printer 

with alcohol for the best stick. 

3.  Attach the Velcro to the mounting spot and the bottom of 

the printer and fasten the printer to the mounting spot.

4.  Connect the data cable to the RS-232 data port on the 

back of the printer.

Printer

Black Data Cable 40’ 

+VP/

Red 

(46)

TXD/

Violet 

(48)

RXD/

Gray 

(49)

CTS/

Green 

(50)

GND/

White 

(51)

GND/

Black 

(30)

CTS/

Blue 

(29)

RXD/

Yellow 

(28)

TXD/

Orange 

(27)

RTS/

Brown 

(26)

24

25

PrInTers 

Disconnect the power before working on the CPU board.

Disconnect Power

For connecting power to the printer see pg. 29.

 See instructions on pages 17 for routing the data 

cable from the back of the truck to the cab.

To communicate via true RS-232 protocol, the +VP Red wire must 

be connected to the J3 terminal block at terminal 47 (not 46).

RS-232 Communication

epson Printer Ground Wire Kit 

Installation

Before connecting power to the LCR-II and the Epson 

printer, ground the printer to the truck cab floor. Epson 

printers sold for truck installations are all grounded in the 

same manner.  

To ground an epson printer: 

1.  Remove one of the mounting bolts fastening the printer 

mounting brackets to the truck cab floor.

2.  Place one end terminal of the ground wire over the 

mounting bolt and return the bolt to its original place.

3.  At the back of the Epson printer, remove the silver ground 

screw marked “FG”.

4.  Place the other end terminal of the ground wire over the 

ground screw and return the screw to its original place.

5.   Check the strap for a good ground connection (see page 

13).

The Epson Printer Ground Wire Kit contains an additional ⅜" ring 

terminal for printer brackets not purchased from Liquid Controls

Additional Terminal

 - 82184 - 

epson Printer Ground Wire Kit 

#

Description

part number

Qty

1

Ground Wire

84101

1

2

Terminal (.375 ring, 16GA)

71878

1

 Epson Printer Ground Wire Kit

The J2 terminal block is 

permanantly attached to the 

CPU board.

Do Not Try To Remove J2

1

#6 Terminal

#10 Terminal

³⁄₈

" Terminal

2

Содержание LectroCount LCR-II E3657 Series

Страница 1: ...LectroCount LCR II Installation Liquid Controls An IDEX Energy Fuels Business Operation EM150 21 E3657 E3658 Series LectroCount LCR II SELECT INCREASE Gallons S3...

Страница 2: ...se 2 ou une alimentation lectrique isol e et comportant un dispositif de protection contre la surtension de 5 amp res ou moins sont requises pour l installation Peripheral equipment must be suitable f...

Страница 3: ...a known good ground less than 1 Use a 12 ga or larger stranded wire Fixed Installations LectroCount housings directly mounted to the meter are attached to the earth ground through the meter via the ta...

Страница 4: ...ower cable Specifications Safety Tag Markings EU Explosive Atmospheres symbol This equipment has been found to comply with the European Directive for Equipment For Potentially Explosive Atmospheres 94...

Страница 5: ...8 Dimensions Side Front Top 15 9 94 5 19 LectroCount LCR II 13 7 5 8 04 10 5 70 Rear...

Страница 6: ...ghts Measures custody transfer product delivery and ticket generation Metrological data collection Presetting by volume Multiple production selection Security settings Air and vapor elimination with p...

Страница 7: ...y standard for many applications Multi layered tickets are available to provide a physical record for both customers and business records The Epson roll printer is ideal for recording multiple custody...

Страница 8: ...xidation from the ground strap contact point Lock washers should penetrate any paint to ensure a good electrical connection Ensure a Good Ground LectroCount Ground Strap Kit 82185 Install the LectroCo...

Страница 9: ...nd discharge line valve nozzle 8 Leave the discharge line valve nozzle open while working on the system 1 Close the belly valve of the supply tank 2 Close the valve on the vapor return line 3 Close th...

Страница 10: ...es Data and Power Cable The LCR II shipment typically includes a gray 40 power cable and a 40 black data cable prewired to terminal blocks on the LCR II CPU board On typical truck installations the ca...

Страница 11: ...Preset Valve Single Stage Electro Pnuematic Valve with V 7 Valve S1 Solenoid V 7 Valve Electro Pnuematic Actuator LectroCount LCR II Gallons A2859 11 Block Valve and 3 Way Solenoid Single Stage 3 Way...

Страница 12: ...eries Electro Pnuematic Valve Electro pnuematic valves use a S1 solenoid operated valve mounted to a pneumatic actuator to open and close a V 7 valve These valves are typically used in high viscosity...

Страница 13: ...llations When ordered as part of a meter system with a LCR II Liquid Control s optical air and vapor eliminators are bolted onto the strainer and wired to the LCR II at the factory Optical air and vap...

Страница 14: ...d PN 81944 that mounts directly to the LCR II CPU board Typically a P transducer operates in conjuction with a shutdown device such as a valve or a dead man The shutdown control must be wired to the L...

Страница 15: ...llation J1 RS 232 A Liquid Controls meter system with a LCR II typically includes an Epson slip printer or roll printer Installation is the same for both printers LCR II s are typically shipped with a...

Страница 16: ...ng Device B RS 485 J2 24 red J2 25 violet Multimeter Network B RS 485 J2 24 red J2 25 violet Power Installation Power Installation Overview When you have made all of the data connections and finished...

Страница 17: ...r the LCR II has been installed check to make sure that it powers up correctly The LCR II display and the printer power light should come on when the truck s ignition is turned to the ON or to the ACC...

Страница 18: ...er provided and held in place with the cotter pin provided The control switch on the front of the LCR II is also sealed with an O ring and held in place by a bushing secured with three socket head cap...

Страница 19: ...sher 2 81994 PULSER 100 PPR Pulser Field Install Kit 82597 08189 Flat Washer 08201 O ring 2 Optional Items not shown Description Part Number Roll Printer Extension Cable 71237 Flash Cable 81885 Lap Pa...

Страница 20: ......

Страница 21: ...2014 Liquid Controls Pub No 500392 7 14 105 Albrecht Drive Lake Bluff IL 60044 2242 1 800 458 5262 847 295 1050 Fax 847 295 1057 www lcmeter com...

Отзывы: