background image

24

25

valves

valves WITH 110vaC solenoIds

In order for the LectroCount LCR-II to control valves with 

solenoids on 110 VAC circuits, you must install a relay 

switch on the positive leg of the solenoid’s circuit. 

relay switch specifications:

Switch:

 SPST (single pole, single throw)

Switch Position

: Normally open

Contact Rating

: Greater than maximum current  

 

 

 

  of solenoid

Voltage

: +12 VDC

Materials needed for wiring valves with 110 vaC 

solenoids: 

not supplied with the valve

•   SPST relay switch (1 per solenoid)
• 

18 AWG stranded wire (2 per solenoid)

• 

Weatherproof flexible conduit, ½" diameter and ½" NPT 

conduit connectors or cable glands

• 

PTFE tape or pipe sealant

To wire 110 vaC solenoids to the lCr-II:

1.  Turn off all 100 VAC circuits before beginning the 

installation.

2.   Install the specified relay switch(es) onto one leg of the 

110 solenoid power supply circuit. 

3.  Connect the relay switch on the S1 power supply circuit 

to terminals 15 and 16 on block J13.

4.  Connect the relay switch on the S2 power supply circuit 

to terminals 17 and 18 on block J13.

Turn off all 110VAC circuits before beginning 

the installation.

Disconnect Power (110VAC)

oPTICal aIr & vaPor elIMInaTors 

Optical Air Eliminator: 

Refined Fuels

Optical Vapor Eliminator: 

LPG and NH

3

S3 Solenoid

Optical Sensor

LectroCount LCR-II

Gallons

S3

52

53

54

55

56

Meter System with Optical Vapor Eliminator

Meter System with Optical Air Eliminator

optical air and vapor eliminator 

Installations

When ordered as part of a meter system with a LCR-

II, Liquid Control’s optical air and vapor eliminators 

are bolted onto the strainer and wired to the LCR-II 

at the factory. Optical air and vapor eliminators can 

also be ordered separately and installed onto meter 

systems already in service. For mechanical installation 

instructions, refer to the manual specific to the optical 

air and vapor eliminator. Instructions for wiring optical air 

and vapor eliminators to the LCR-II are provided on this 

page. 

Materials needed for wiring valves: 

not supplied 

with the air or vapor eliminator

• 

18 AWG stranded wire (2 for the S3 solenoid valve)

• 

Weatherproof flexible conduit, ½" diameter and ½" NPT 

conduit connectors or cable glands

• 

PTFE tape or pipe sealant

To wire optical air and vapor eliminators to the 

lCr-II:

1.   Attach cable glands and/or conduit connectors to the S3 

solenoid valve, the optical sensor, and the LCR ports. 

2.  Thread the 18 AWG wires through a piece of 

weatherproof conduit cut-to-length from the S3 solenoid 

to a LCR-II port. 

3.  Run the weatherproof conduit between the S3 solenoid-

operated valve and the LCR-II housing. Pull the wires 

through the ports, and tighten the connectors.

 Liquid 

Controls recommends running the optical sensor wire 

through weatherproof conduit as well.

4.  Connect the three 18 AWG wires to the S3 solenoid-

operated valve terminals and to terminals 52 and 53 on 

the J15 terminal block of the LCR-II CPU board.

5.  Connect the optical sensor wires to terminals 54, 55, and 

56 on the J15 terminal block of the LCR-II CPU board.

Disconnect the power before working on the CPU board.

Disconnect Power

Содержание LectroCount LCR-II E3657 Series

Страница 1: ...LectroCount LCR II Installation Liquid Controls An IDEX Energy Fuels Business Operation EM150 21 E3657 E3658 Series LectroCount LCR II SELECT INCREASE Gallons S3...

Страница 2: ...se 2 ou une alimentation lectrique isol e et comportant un dispositif de protection contre la surtension de 5 amp res ou moins sont requises pour l installation Peripheral equipment must be suitable f...

Страница 3: ...a known good ground less than 1 Use a 12 ga or larger stranded wire Fixed Installations LectroCount housings directly mounted to the meter are attached to the earth ground through the meter via the ta...

Страница 4: ...ower cable Specifications Safety Tag Markings EU Explosive Atmospheres symbol This equipment has been found to comply with the European Directive for Equipment For Potentially Explosive Atmospheres 94...

Страница 5: ...8 Dimensions Side Front Top 15 9 94 5 19 LectroCount LCR II 13 7 5 8 04 10 5 70 Rear...

Страница 6: ...ghts Measures custody transfer product delivery and ticket generation Metrological data collection Presetting by volume Multiple production selection Security settings Air and vapor elimination with p...

Страница 7: ...y standard for many applications Multi layered tickets are available to provide a physical record for both customers and business records The Epson roll printer is ideal for recording multiple custody...

Страница 8: ...xidation from the ground strap contact point Lock washers should penetrate any paint to ensure a good electrical connection Ensure a Good Ground LectroCount Ground Strap Kit 82185 Install the LectroCo...

Страница 9: ...nd discharge line valve nozzle 8 Leave the discharge line valve nozzle open while working on the system 1 Close the belly valve of the supply tank 2 Close the valve on the vapor return line 3 Close th...

Страница 10: ...es Data and Power Cable The LCR II shipment typically includes a gray 40 power cable and a 40 black data cable prewired to terminal blocks on the LCR II CPU board On typical truck installations the ca...

Страница 11: ...Preset Valve Single Stage Electro Pnuematic Valve with V 7 Valve S1 Solenoid V 7 Valve Electro Pnuematic Actuator LectroCount LCR II Gallons A2859 11 Block Valve and 3 Way Solenoid Single Stage 3 Way...

Страница 12: ...eries Electro Pnuematic Valve Electro pnuematic valves use a S1 solenoid operated valve mounted to a pneumatic actuator to open and close a V 7 valve These valves are typically used in high viscosity...

Страница 13: ...llations When ordered as part of a meter system with a LCR II Liquid Control s optical air and vapor eliminators are bolted onto the strainer and wired to the LCR II at the factory Optical air and vap...

Страница 14: ...d PN 81944 that mounts directly to the LCR II CPU board Typically a P transducer operates in conjuction with a shutdown device such as a valve or a dead man The shutdown control must be wired to the L...

Страница 15: ...llation J1 RS 232 A Liquid Controls meter system with a LCR II typically includes an Epson slip printer or roll printer Installation is the same for both printers LCR II s are typically shipped with a...

Страница 16: ...ng Device B RS 485 J2 24 red J2 25 violet Multimeter Network B RS 485 J2 24 red J2 25 violet Power Installation Power Installation Overview When you have made all of the data connections and finished...

Страница 17: ...r the LCR II has been installed check to make sure that it powers up correctly The LCR II display and the printer power light should come on when the truck s ignition is turned to the ON or to the ACC...

Страница 18: ...er provided and held in place with the cotter pin provided The control switch on the front of the LCR II is also sealed with an O ring and held in place by a bushing secured with three socket head cap...

Страница 19: ...sher 2 81994 PULSER 100 PPR Pulser Field Install Kit 82597 08189 Flat Washer 08201 O ring 2 Optional Items not shown Description Part Number Roll Printer Extension Cable 71237 Flash Cable 81885 Lap Pa...

Страница 20: ......

Страница 21: ...2014 Liquid Controls Pub No 500392 7 14 105 Albrecht Drive Lake Bluff IL 60044 2242 1 800 458 5262 847 295 1050 Fax 847 295 1057 www lcmeter com...

Отзывы: