Introduction
5
Safety Procedures
BE PREPARED
·
Before using this product, read and understand the instructions.
·
All work must be performed by qualified personnel trained in the proper application,
installation, and maintenance of equipment and/or systems in accordance with all
applicable codes and ordinances.
·
When handling electronic components and boards, always use proper Electrostatic
Discharge (ESD) equipment and follow the proper procedures.
·
Make sure that all necessary safety precautions have been taken.
·
Provide for proper ventilation, temperature control, fire prevention, evacuation, and fire
management.
·
Provide easy access to the appropriate fire extinguishers for your product.
·
Consult with your local fire department, state, and local codes to ensure adequate
preparation.
·
Read this manual as well as all the literature provided in your owner’s packet.
·
Save these instructions for future reference.
·
Failure to follow the instructions set forth in this publication could result in property
damage, personal injury, or death from fire and/or explosion, or other hazards that
may be associated with this type of equipment.
SAFELY EVACUATE PIPING SYSTEM
Before disassembly of any meter or accessory component:
ALL INTERNAL
PRESSURES MUST BE RELIEVED AND ALL LIQUID DRAINED FROM THE SYSTEM
IN ACCORDANCE WITH ALL APPLICABLE PROCEDURES.
·
Pressure must be 0 (zero) psi.
·
Close all liquid and vapor lines between the meter and liquid source.
For Safety Rules Regarding LPG, refer to NFPA Pamphlet 58 and local authorities.
Failure to follow this warning could result in property damage, personal injury, or
death from fire and/or explosion, or other hazards that may be associated with
this type of equipment.
OBSERVE NATIONAL & LOCAL CODES
Содержание LectroCount LCR 600
Страница 1: ...LectroCount LCR 600 E3708 E3709 Series...
Страница 13: ...Introduction 13 Dimensions...
Страница 14: ...Introduction...
Страница 27: ...Installation 27 Bench Seats Adjustable for Distance to the Steering Wheel Manufacturer Standard or equivalent...
Страница 42: ...Installation Disconnect Power Disconnect the power before working on the CPU board...
Страница 54: ...Installation...
Страница 61: ...Installation 61...
Страница 63: ...Installation 63...
Страница 72: ...Installation Epson Printer Power Connections LectroCount LCR 600 Power Connections...
Страница 75: ...Installation 75 Bill of Materials External Components...
Страница 76: ...Installation Internal Components...