Installation
10. Run the red jumper wire (provided with the ∆P transducer kit) from the J8 terminal 32 to J16
terminal 59 (+5 V).
11. Route a two-wire cable from the shutdown control device through a cable gland in a port on the
back of the LCR 600. Secure the cable gland. LC recommends running the cable through
weatherproof conduit.
12. Connect the two wires from the shutdown control device to terminal block J13, terminals 14 and
15.
Current Draw on Shutdown Device
The shutdown device should draw no more than 1 Amp.
Содержание LectroCount LCR 600
Страница 1: ...LectroCount LCR 600 E3708 E3709 Series...
Страница 13: ...Introduction 13 Dimensions...
Страница 14: ...Introduction...
Страница 27: ...Installation 27 Bench Seats Adjustable for Distance to the Steering Wheel Manufacturer Standard or equivalent...
Страница 42: ...Installation Disconnect Power Disconnect the power before working on the CPU board...
Страница 54: ...Installation...
Страница 61: ...Installation 61...
Страница 63: ...Installation 63...
Страница 72: ...Installation Epson Printer Power Connections LectroCount LCR 600 Power Connections...
Страница 75: ...Installation 75 Bill of Materials External Components...
Страница 76: ...Installation Internal Components...