Installation
51
Optical Air and Vapor Eliminators
Optical Air and Vapor Eliminator Installations
When ordered as part of a meter system with a LCR 600, the Liquid Control optical air and vapor
eliminators are bolted onto the strainer and wired to the LCR 600 at the factory. Optical air and vapor
eliminators can also be ordered separately and installed onto meter systems already in service. For
mechanical installation instructions, refer to the manual specific to the optical air and vapor eliminator.
Instructions for wiring optical air and vapor eliminators to the LCR 600 are provided below.
Materials needed for wiring valves
These materials are necessary, but are not supplied with the valve:
·
20 AWG stranded wire–3 per solenoid. Unnecessary for 3-way solenoid valves. Only 2 are
necessary for E7 solenoids.
·
Weatherproof flexible conduit, ½" diameter.
·
½" NPT conduit connectors or cable glands.
·
PTFE tape or pipe sealant.
Содержание LectroCount LCR 600
Страница 1: ...LectroCount LCR 600 E3708 E3709 Series...
Страница 13: ...Introduction 13 Dimensions...
Страница 14: ...Introduction...
Страница 27: ...Installation 27 Bench Seats Adjustable for Distance to the Steering Wheel Manufacturer Standard or equivalent...
Страница 42: ...Installation Disconnect Power Disconnect the power before working on the CPU board...
Страница 54: ...Installation...
Страница 61: ...Installation 61...
Страница 63: ...Installation 63...
Страница 72: ...Installation Epson Printer Power Connections LectroCount LCR 600 Power Connections...
Страница 75: ...Installation 75 Bill of Materials External Components...
Страница 76: ...Installation Internal Components...