Installation
Earth Grounds for Solenoid Valves
The Earth grounds for Terminals 16 & 19 are optional. The solenoid operated valves are grounded
through the component they are mounted on.
To wire a single stage valves for presetting:
1. Wire the S1 solenoid, as instructed above.
2. Run a jumper wire from Terminal 15 to Terminal 18.
Содержание LectroCount LCR 600
Страница 1: ...LectroCount LCR 600 E3708 E3709 Series...
Страница 13: ...Introduction 13 Dimensions...
Страница 14: ...Introduction...
Страница 27: ...Installation 27 Bench Seats Adjustable for Distance to the Steering Wheel Manufacturer Standard or equivalent...
Страница 42: ...Installation Disconnect Power Disconnect the power before working on the CPU board...
Страница 54: ...Installation...
Страница 61: ...Installation 61...
Страница 63: ...Installation 63...
Страница 72: ...Installation Epson Printer Power Connections LectroCount LCR 600 Power Connections...
Страница 75: ...Installation 75 Bill of Materials External Components...
Страница 76: ...Installation Internal Components...