Installation
Differential Pressure Transducer
Differential Pressure (∆P) Transducer Installation
When ordered as part of a meter system with a LCR 600, Liquid Control’s ∆P transducer is wired to the
LCR 600 at the factory. The ∆P transducer can also be ordered separately and installed onto a meter
system already in service. Refer to the ∆P transducer manual for complete installation instructions.
Instructions for wiring the ∆P transducer to the LCR 600 can be found below.
The ∆P Transducer requires an additional board (PN 81944) that mounts directly to the LCR 600 CPU
board.
Typically, a ∆P transducer operates together with a shutdown device, such as a valve or a dead-man.
Do NOT Try to Remove J2
The J2 terminal block is permanently attached to the CPU board.
Be Especially Careful with the CPU Board
Содержание LectroCount LCR 600
Страница 1: ...LectroCount LCR 600 E3708 E3709 Series...
Страница 13: ...Introduction 13 Dimensions...
Страница 14: ...Introduction...
Страница 27: ...Installation 27 Bench Seats Adjustable for Distance to the Steering Wheel Manufacturer Standard or equivalent...
Страница 42: ...Installation Disconnect Power Disconnect the power before working on the CPU board...
Страница 54: ...Installation...
Страница 61: ...Installation 61...
Страница 63: ...Installation 63...
Страница 72: ...Installation Epson Printer Power Connections LectroCount LCR 600 Power Connections...
Страница 75: ...Installation 75 Bill of Materials External Components...
Страница 76: ...Installation Internal Components...