Instructions
Saddle-mount unit GSG-S-VM
45 - 72
010710-03-EN BA GSG-S-VM / 13.07.2020
19. Spray test
•
Fill GSG-S-VM spray liquid tank partially with water, not pressur-
ized.
•
Set the 3-way valve to position
“Suction tank”.
(Fig. 24)
Fig. 24
•
Position:
“Suction tank”
Liquid is pumped from the spray liquid tank / fresh-
water tank to the nozzles in the tunnel walls.
•
Switch on mixing unit and recycling injectors.
•
Open required nozzles.
•
Switch on power take-off shaft for pump and regulate to max.
540 RPM.
•
Set the desired pressure at the control box and check whether
nozzles are spraying correctly.
•
Conduct test spraying with water for nozzle setting on foliage
wall.
Содержание GSG-S-VM
Страница 2: ...Instructions Saddle mount unit GSG S VM 2 72 010710 03 EN BA GSG S VM 13 07 2020...
Страница 30: ...Instructions Saddle mount unit GSG S VM 30 72 010710 03 EN BA GSG S VM 13 07 2020...
Страница 70: ...Instructions Saddle mount unit GSG S VM 70 72 010710 03 EN BA GSG S VM 13 07 2020 34 Notices...
Страница 72: ...72 72 Design mail bauer ib com...