Section 5. Maintenance
Figure 5-3. Insert the recharged bottles cap first. Make sure the caps have holes in the top.
5
Use the retention screw to remove the bottle cover on the upper sensor head housing and insert
the new, recharged bottle, cap first.
Figure 5-4. Remove the upper sensor head housing bottle cover and replace the chemical
bottle. Insert the bottle cap first.
6
Replace the cover retention screw and reattach the mounting bracket.
After installing, allow at least 24 hours (with the instrument powered on) to scrub
the housing; otherwise, the instrument may still drift.
7
Set the CO
2
and H
2
O zeros. Check the zero again, if possible, after one or two days.
5-6
LI-7200RS Enclosed CO₂/H₂O Analyzer
Содержание LI7200RS
Страница 1: ...Enclosed CO2 H2O Gas Analyzer Instruction Manual...
Страница 2: ......
Страница 11: ...ix Appendix C Suppliers Appendix D Configuration Grammar Appendix E Warranty Appendix F Index...
Страница 12: ...x...
Страница 20: ...Section 1 General Information 1 8 LI 7200RS Enclosed CO H O Analyzer...
Страница 54: ...Section 3 Operation 3 12 LI 7200RS Enclosed CO H O Analyzer...
Страница 112: ...Section 4 User Calibration 4 12 LI 7200RS Enclosed CO H O Analyzer...
Страница 130: ...Section 5 Maintenance 5 18 LI 7200RS Enclosed CO H O Analyzer...
Страница 138: ...Section 6 Troubleshooting 6 8 LI 7200RS Enclosed CO H O Analyzer...
Страница 184: ...Section 8 Theory of Operation 8 12 LI 7200RS Enclosed CO H O Analyzer...
Страница 187: ...Gas Analyzer Dimensions Appendix A Specifications A 3 Appendix A Specifications...
Страница 188: ...Appendix A Specifications LI 7550 Dimensions A 4 LI 7200RS Enclosed CO H O Analyzer...
Страница 192: ...Appendix B Pin Assignments B 2 LI 7200RS Enclosed CO H O Analyzer...
Страница 196: ...Appendix C Suppliers C 4 LI 7200RS Enclosed CO H O Analyzer...
Страница 225: ......