Maintenance and Calibration Log
All maintenance and testing should be done by competent personnel.
Regularly scheduled maintenance ensures proper functioning of the
equipment. Refer to the table below for required tasks and frequency of
routine maintenance.
Scheduled Maintenance and Calibration Checklist
Task
Every Use
Every 30 Days
Every 12 Months
Clean Exterior
9
General
9
Inspection
Change Distilled
9
Water
Lubricate O-Rings
9
Disinfect
9
Recirculating
Solution Reservoir
Change 0.3%
9
Hydrogen
Peroxide Solution
Replace O-Rings
9
Clean Fan Filter
9
Test Over
9
Temperature Alarm
Test Add
9
Recirculating
Solution Alarm
Test Disposable
9
Alarm
Test Fluid Warmer
9
Alarm Signal
Verify Temperature
9
Calibration
Electrical Safety
9
Tests
S E C T I O N 1 2 • M a i n t e n a n c e
64
|
Operator’s Manual
Содержание H-1200 115V
Страница 1: ...OPERATOR S MANUAL P N 4533708GB Rev 006 lTM s...
Страница 2: ...ii Operator s Manual...
Страница 24: ...S E C T I O N 6 P r i n c i p l e o f O p e r a t i o n Operator s Manual H 1200 H 1200 18...
Страница 33: ...Operator s Manual S E C T I O N 7 C o n t r o l s a n d D i s p l a y s 27...
Страница 34: ...Operator s Manual 28 S E C T I O N 8 O p e r a t i o n...
Страница 78: ...Operator s Manual S E C T I O N 1 6 Symbols S E C T I O N 1 6 S y m b o l s 72...
Страница 79: ...S E C T I O N 1 6 S y m b o l s Operator s Manual 73...