Completing the installation
Use this information for instructions on what you need to do after you install devices in the server to
complete the installation process.
To complete the installation, complete the following steps:
Step 1. Make sure that all cables are connected properly.
Step 2. Update the server configuration (see “Updating the server configuration” on page 117).
Step 3. Reconnect the power cords.
Step 4. Start the server. Confirm that is starts correctly and recognizes the newly installed devices, and
make sure that no error LEDs are lit.
Step 5. Business Partners only) Complete the additional steps in “Instructions for Business Partners” on
Step 6. If you want to install the server in a rack, go to
http://systemx.lenovofiles.com/help/topic/
com.lenovo.sysx.6241.doc/printable_doc.html
for the
Rack Installation Instructions
document which
contains complete rack installation and removal instructions.
Updating the server configuration
This topic provides information about the server configuration tasks that you might need to perform when
you add and remove devices.
When you start the server for the first time after you add or remove a device, you might receive a message
that the configuration has changed. The Setup utility starts automatically so that you can save the new
configuration settings.
Some optional devices have device drivers that you must install. For information about installing device
drivers, see the documentation that comes with each device.
If the server has an optional RAID adapter and you have installed or removed a hard disk drive, see the
documentation that comes with the RAID adapter for information about reconfiguring the disk arrays.
The server comes with at least one microprocessor. If more that one microprocessor is installed, the server
can operate as a symmetric multiprocessing (SMP) server. You might have to upgrade the operating system
to support SMP. For more information, see “Typical operating-system installation” on page 122 and the
operating-system documentation.
For information about configuring the integrated Ethernet controller, see “Configuring the Ethernet controller”
on page 139.
.
117
Содержание 6241
Страница 1: ...System x3850 X6 and x3950 X6 Installation and Service Guide Machine Type 6241 ...
Страница 6: ...iv System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 56: ...42 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 82: ...68 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 132: ...118 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 158: ...144 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 214: ...200 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 358: ...344 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 1938: ...1924 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 1964: ...1950 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 1968: ...1954 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 1975: ...Taiwan Class A compliance statement Appendix F Notices 1961 ...
Страница 1976: ...Taiwan BSMI RoHS declaration 1962 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 1988: ...1974 System x3850 X6 and x3950 X6 Installation and Service Guide ...
Страница 1989: ......
Страница 1990: ......