Page 70
A2 diagram with B2 diagram
ECH16-82/95/135/160 20kW & 30kW 208/230V Sequence
Operation Sequence: A2 Section and B2 Sections
(20/30kW 208/230V electric heat wired to CHA16-1603)
1- 1st stage heating demand closes W1. W1 passes through primary limits S15 to energize
contactor K15, relay K9 and time delay DL2. K151 contacts close and K91 and K92 both
switch.
2- When K151 closes, heating elements HE1 are energized. The elements are arranged in a Del
ta" configuration for 208/230V operation.
3- When K91 switches, indoor blower contactor K3 is energized. When K92 switches, time delay
DL2 is enabled (circuit is closed to W2).
4- When K3 is energized, the indoor blower is powered (and optional economizer opens to mini
mum position when K32 contacts close).
5- Additional heating demand W2 passes through K92 to energize time delay DL2.
6- DL2 closes after 30 seconds. Contactor K16 is energized.
7- When K161 closes, heating elements HE2 are energized.
Содержание CHA16
Страница 47: ...Page 47 FIGURE 52 CYCLE CONTROL KIT WIRING DIAGRAM...
Страница 55: ...Page 55 NOTES...
Страница 58: ...C1diagram electromechanical thermostat with modulating economizer with D5 diagram Page 58...
Страница 60: ...C2 1 diagram electromechanical thermostat with modulating economizer and warm up with D5 diagram Page 60...
Страница 62: ...Page 62 B41 diagram with C1 diagram CHA16 2553 2753 3003 Operating Sequence...
Страница 64: ...Page 64 B9 diagram with C1 diagram CHA16 1853 Operating Sequence...