Page 65
CHA161853 Operation Sequence: B9 Section and C1 Sections
(Basic Unit with Basic Electromechanical Thermostat)
Blower Operation:
1- Blower demand from thermostat terminal G energizes pilot relay K46. N.O.
K461 closes energizing blower contactor K3. K32 energizes the economiz
er (If installed). Outdoor damper drives to minimum position.
2- N.O. K31 closes, blower begins operation.
1st Stage Cooling:
3- Cooling demand energizes Y1 and G in the thermostat. G energizes
blower (see step 1).
4- After a delay from DL8 (30 second on delay, 240 second off delay), Y1 ener
gizes pilot relay K66.
5- N.O. K661 closes. 24VAC power energizes outdoor fan relay K10 and
Time Delay DL15. In 30 seconds compressor two will begin operation
(see step 8). The unit is equipped with three compressors. Two com
pressors operate in the first stage of cooling.
6- 24VAC power energizes outdoor fan relay K10.
7- N.O. K101 closes energizing condenser fan motors B4 and B5.
8- 24VAC power is routed through N.C. low discharge temp. sensor S3, N.C.
freezstat S49, N.C. high pressure limit S4 and N.C. low pressure limit S24 to
energize compressor contactor K1.
9- N.O. Contacts K1-1 close energizing compressor B1.
10- Time delay DL15 closes in 30 seconds from initial first stage thermostat de
mand. 24VAC power is routed through N.C. freezstat S50, N.C. high pres
sure limit S7 and N.C. loss of charge switch S25 energizing compressor
contactor K2.
11- N.O. Contacts K21 close energizing compressor B2.
2nd Stage Cooling:
12- Second stage cooling demand energizes Y2.
13- After a delay from DL9 (30 second on delay, 240 second off delay), Y2 ener
gizes pilot relay K67.
14- N.O. K671 closes.
15- 24VAC power is routed through N.C. freezstat S53, N.C. high pressure limit
S28 and N.C. loss of charge switch S34 to energize compressor contactor
K14.
16- N.O. K141 closes energizing compressor 3 (second stage.)
1st Stage Heating: (See CHA161853 with Electric Heat Pages 5657)
17- Heating demand energizes W1 in the thermostat. Pilot relay K77 is
energized.
18- N.O. K771 close energizing electric heat stage 1 The operation sequence of
electric heat units varies depending on size (kW input rating) and line voltage
rating.
2nd Stage Heating (If equipped with multiple stage heating):
(See CHA161853 with Electric Heat Pages 5657)
19- Additional heating demand energizes W2 in the thermostat. Pilot relay
K49 is energized.
20- N.O. K491 close energizing electric heat stage . The operation sequence of
electric heat units varies depending on size (kW input rating) and line voltage
rating.
Safety Blower Operation:
21- If either limits in the electric heat section trip, the heating elements are
immediately deenergized.
22- The indoor blower remains energized, powered by K3 which is ener
gized by thermostat demand.
Содержание CHA16
Страница 47: ...Page 47 FIGURE 52 CYCLE CONTROL KIT WIRING DIAGRAM...
Страница 55: ...Page 55 NOTES...
Страница 58: ...C1diagram electromechanical thermostat with modulating economizer with D5 diagram Page 58...
Страница 60: ...C2 1 diagram electromechanical thermostat with modulating economizer and warm up with D5 diagram Page 60...
Страница 62: ...Page 62 B41 diagram with C1 diagram CHA16 2553 2753 3003 Operating Sequence...
Страница 64: ...Page 64 B9 diagram with C1 diagram CHA16 1853 Operating Sequence...