Page 20
CHA16823, 953 PLUMBING COMPONENTS
FIGURE 14
FAN
CONDENSER COILS
CONTROL BOX
DRIERS
THERMOMETER
WELLS and
LIQUID LINE
SERVICE
PORTS
SUCTION LINE
SERVICE
PORTS
LOSS OF CHARGE
SWITCH (S24)
SWITCH (S25)
HIGH PRESSURE
LIMIT (S7)
LIMIT (S4)
COMPRESSOR
SERVICE ACCESS OPENING
2ND STAGE
EVAPORATOR
1ST STAGE
EVAPORATOR
EXPANSION
VALVE
1STSTAGE
2NDSTAGE
EXPANSION
VALVE (2)
2nd STAGE
CONDENSER FAN
FAN CAPACITORS (2)
FAN ORIFICES (S)
1st STAGE
CONDENSER FAN
1st STAGE
THERMOMETER
WELL
LIQUID LINE
SERVICE PORT
FILTER/DRIER
SUCTION LINE
SERVICE PORT
DISCHARGE LINE
SERVICE PORT
COMPRESSOR
HIGH PRESSURE
LIMIT (S4)
CONDENSER COILS (2)
COMPARTMENT DIVIDER MUST BE IN PLACE DURING
UNIT OPERATION
END VIEW SERVICE ACCESS OPENING
HIGH PRESSURE
LIMIT (S7)
DISCHARGE LINE
SERVICE PORT
COMPRESSOR
SUCTION LINE
SERVICE PORT
LIQUID LINE
SERVICE PORT
THERMOMETER
WELL
2nd STAGE
FILTER RACK
EVAPORATOR (2)
SUCTION
MANIFOLD (2)
CHA16-1353,1603 PLUMBING COMPONENTS (END VIEW COMPRESSOR COMPARTMENT)
CONTROL BOX
LOSS OF CHARGE
SWITCH (S25)
LOW AMBIENT SWITCH
(S24)
FILTER/DRIER
FREEZESTATS (2)
S49 and S50
FIGURE 15
Содержание CHA16
Страница 47: ...Page 47 FIGURE 52 CYCLE CONTROL KIT WIRING DIAGRAM...
Страница 55: ...Page 55 NOTES...
Страница 58: ...C1diagram electromechanical thermostat with modulating economizer with D5 diagram Page 58...
Страница 60: ...C2 1 diagram electromechanical thermostat with modulating economizer and warm up with D5 diagram Page 60...
Страница 62: ...Page 62 B41 diagram with C1 diagram CHA16 2553 2753 3003 Operating Sequence...
Страница 64: ...Page 64 B9 diagram with C1 diagram CHA16 1853 Operating Sequence...