Mounting and start-up
Vento
®
1.0
11 / 52
Before start-up, make sure that the hopper on the
Vento
®
has been firmly bolted in place. To do this, check the four
knurled screws
(1).
Filling
1. Make sure that the spreader and blower are
switched off.
2. To fill the spreader, release the rubber clamping
band
(2)
on the hopper and remove the cover
(3).
3. Make sure that suitable rotary valves are fitted ac-
cording to the spreading material table, and that the
load relief roof of the agitator has been mounted cor-
rectly.
4. Fill the spreading material, making sure that no for-
eign bodies or impurities get into the hopper.
5.
Before closing the hopper, make sure that the
seal is in place all round between the hopper
and the hopper cover.
6. Close the hopper with the four rubber clamping
bands
(2)
making a firm seal.
Warning!
Incorrect filling will lead to incorrect dosing applications.
•
The hopper cover must be closed during operation, in order to avoid incorrect dosing applications.