Mounting and start-up
Vento
®
II
1.0
15 / 74
3.8 Filling the Vento
®
II
Warning!
Risk of injury during operation if the spreading material hopper is open, due to spread-
ing material being thrown out and rotating parts.
This can cause injuries to the eyes and crushing injuries.
•
Only operate when the hopper cover is closed.
•
Always switch off the spreader and blower before opening the spreading material hopper.
Warning!
Risk of injury!
•
Wear appropriate working and protective clothing during all work.
•
Comply with the regulations of the fertiliser manufacturer.
Advice
Attach the data sheet of the fertiliser used in a clearly visible position on the spreader.
Advice
Make sure that no foreign bodies (e.g. packaging material) get into the hopper, in order to avoid malfunc-
tions.
Before starting, ensure that the hopper on the
Vento
®
II
is completely secure.
2
3
Filling
1. Make sure that the spreader and blower are
switched off.
2. To fill the spreader release the rubber straps
(2)
on
the hopper and remove the cover
(3)
.
3. Make sure that suitable rotary valves are fitted ac-
cording to the spreading material table, and that the
load relief roof of the agitator has been mounted cor-
rectly.
4. Fill the spreading material, making sure that no for-
eign bodies or impurities get into the hopper.
5.
Before closing the hopper, make sure that the
seal is in place all round between the hopper
and the hopper cover.
6. Seal the hopper using the four rubber straps
(2)
.
Содержание Vento II
Страница 73: ...Vento II 1 0 73 74 ...