Mounting and start-up
10 / 74
1.0
Vento
®
II
3 Mounting and start-up
Warning!
Risk of injury due to inadequate attachment
If the spreader or hopper tip over, this can cause crushing or other injuries.
•
Only mount the spreader on carrier vehicles that have a sufficient load carrying capability.
•
Before start-up, make sure that the implement, spreading material hopper and hopper cover have
been correctly attached.
3.1 Implement holder
The
Vento
®
II
is supplied mounted on the universal
holder as standard. The mounting is specifically depen-
dent upon the carrier vehicle provided, and must be
adapted to its conditions.
Before operation, check the attachment of the spread-
er on the universal holder. The attachment must be se-
cured with the safety bolts (1). If replacing them, use
M10 bolts with a strength class of at least 8.8, with self-
locking nuts.
Optionally, installation is possible using U-brackets
(2) on a square tube with dimensions 80×80 mm to
120×120 mm.
3.2 Install the control panel
Install the universal holder supplied in the package in the working range of the driver.
The installation is specifically dependent upon the carrier vehicle provided, and must be adapted to its conditions.
Advice
Select the installation position so that the accessibility of other controls is not adversely affected.
1. Secure the universal holder to the vehicle using
point (1) and (2).
Содержание Vento II
Страница 73: ...Vento II 1 0 73 74 ...