Mounting and start-up
14 / 74
1.0
Vento
®
II
3.6 Connect the control panel
1. Connect the signal cable
(2)
on the electronic link-
age control to the 7-pole socket
(1)
.
2. Connect the control cable
(4)
on the spreader to the
multi-pole socket
(3)
.
1. Place the control panel plug into the socket
(1)
on
the supplied battery cable.
2. Connect the connector
(2)
on the black cable to the
negative pole on the battery (not to the bodywork).
3. Connect the connector
(3)
on the red cable with the
fuse
(4)
to the positive pole on the battery.
Advice
•
Use the supplied 6 mm² battery cable to ensure a perfect power supply.
•
A poor power supply may prevent you from achieving the desired blower speed. Also, this could lead
to intermittent complete failure.
Any changes to cable or plug connections without factory approval automatically invalidates the entire warranty.
Changes to cables undertaken by the customer are taken into account in the case of repair.
The spreader is ready for use.
3.7 Adjust the empty indicator
The empty indicator is given a default setting at the factory.
If you use particularly lightweight spreading material, it may be that the sensitivity of the empty indicator has to be
adjusted.
Adjust the empty indicator:
1. Turn the red setting screw clockwise.
This increases the sensitivity of the empty indicator.
2. Turn the red setting screw anti-clockwise.
This reduces the sensitivity of the empty indicator.
Содержание Vento II
Страница 73: ...Vento II 1 0 73 74 ...