mc²36 MKII Installation & Service Guide
Version: 1.0/1
50/56
5. Service Procedures
3.
Once all the cables have been disconnected and carefully stowed, loosen the unit from the console
frame.
There are five hex nuts holding the unit in place.
A__UHD Core (side view)
4.
Carefully lift the core out of the console frame. Take care that the frame does not scrape the unit, and
that the cables do not get caught.
You are now ready to fit the replacement.
5.
Position the new unit into the frame, taking care not to scratch the unit or get any cables caught
underneath. Tighten the five hex nuts to hold the unit in place.
6.
Replace all connectors (see step 2).
7.
Replace the Central Panel, and fasten into place (see step 1).
8.
When everything is back in place, re-connect the rear
MAINS
IEC power connectors, and power on.
The control system will start to boot. When boot-up is complete, the console will reset accordingly.
You can now reset the management IP address in the usual manner, and transfer back your user data.