mc²36 MKII Installation & Service Guide
Version: 1.0/1
30/56
4. Installation
8.
Secure the connector to the rear panel by replacing the two screws (removed in step 5).
9.
Repeat steps 6 to 8 to thread the remaining cables and secure the connectors.
You are now ready to connect the SFP modules to the internal processing core (inside the frame).
10.
From the front of the console, guide each of the cables towards the internal processing core and insert
the SFP module into the correct slot.
Make sure that the cables run properly through the frame and are fixed in place using the cable raceways.
Take care not to bend the cables by laying sufficient loops as shown.
Inside Console Frame
SFPs & Cables (correctly installed)
The SFP slots are numbered as shown in the diagram below. You should use slot 1 for IO port 1, slot 2 for IO
port 2, and so on. Note that slot 7 is reserved for the internal connection to the Local IO, and slot 8 is unused.
Internal Processing Core (connections)
Once the SFP modules are installed, you are ready to close the frame.
11.
Close the Central Panel (see step 4).
12.
Replace the Overbridge blanking panel (see steps 1 to 3).
13.
When everything is back in place, re-connect the rear mains IEC power connectors, and power on.
Then check the functionality of the newly connected IO ports.