mc²36 MKII Installation & Service Guide
Version: 1.0/1
22/56
4. Installation
4.12
Control
Console Rear Panel
The
MGMT A
&
MGMT B
ports provide a connection to the mc
2
control system (via the Gateserver) for remote
operation, configuration and maintenance. Only one connection is essential for operation. A second connection
can be installed to support redundancy.
Connections are made via TCP/IP Ethernet.
A single computer or device can connect directly. However, it is more common to install a network switch to
create a dedicated Management Network.
Lawo may deliver a suitable network switch with the system. This could be replaced by any other suitable switch
fabric that provides comparable performance.
You must use a network switch and
NOT
a hub, and keep the Management Network separate from other
traffic within the installation. The switch should support 1GB for best performance.
Cable Specification
Choose an Ethernet cable that meets the following specification.
·
Cable
: CAT 5 or better (CAT 5e/6/7); straight (1:1) or crossed cable*.
·
Connector
: RJ45.
·
Network Speed
: 1000, 100 or 10 Base-TX LAN. 1000 Base-TX (Gigabit Ethernet) is recommended.
·
Length
: up to 100m.
*For a direct connection, you will need a crossed network cable. When connecting to a network switch, use a
straight (1:1) cable.