![LAVAMAC GA120L Скачать руководство пользователя страница 64](http://html.mh-extra.com/html/lavamac/ga120l/ga120l_installation-operation-and-maintenance_680543064.webp)
Steam Requirements
64
Part No. 70476501ENR7
Steam Pressure PSI ( bar)
Minimum Supply Pipe Diameter
Steam Trap Size*
Pounds Condensate/Hour
(Kilograms Condensate/Hour)
80-100 (5.3-6.9)
1-1/4 in. NPT
517 (235)
* Based on 6.9 bar.
Table 12
Piping Recommendations
•
Trap each steam coil individually. Always keep the trap
clean and in good working condition.
•
When tumble dryer is on the end of a line of equipment,
extend header at least 4 feet (1.2 m) beyond tumble dryer.
Install shut-off valve, union, check valve and bypass trap at
end of line. If gravity return to boiler, omit trap.
•
Insulate steam supply and return lines for safety of operator
and safety while servicing tumble dryer.
WARNING
All system components must have a 125 psig
(8.6 bar) working pressure. Shut-off valves must
be installed upstream of the steam solenoid valve
and downstream of each steam trap so components
can be isolated for maintenance or emergency
purposes. All components (solenoid valve, traps)
must be supported to minimize loads on the tumbler
steam coil connections.
W701
Installing Steam Trap and Making
Condensate Return Connections
The steam trap must be installed and the coil outlet
connections must be connected to the condensate return
lines. The following steps outline the procedure for
installing the steam trap and connecting the condensate
return lines. Refer to Figure 21 120 Series Tumble Dryers
and Figure 22 170 and 200 Series Tumble Dryers for
typical installations.
1. Use flexible lines between steam inlet solenoid and steam
coils, as well as outlet between steam coil and traps.
2. If necessary, install a strainer at the end of each flexible
hose.
3. Install a steam trap to each strainer.
IMPORTANT: Steam trap must be installed a
minimum of 18 inches (457 mm) below the steam
coil outlet connections.
4. Install a shut-off valve to each steam trap.
5. Connect to the condensate return lines.
6. For steam solenoid valve wiring connections, refer to
Wiring Diagram supplied with tumble dryer.
Thermal Oil Prep
It is the responsibility of the customer to install appropriate
coil and heating system for thermal oil prep models. The
manufacturer is not responsible for the performance or safety
of the customer installed thermal oil system. To ensure proper
operation, refer to the Specifications and Dimensions section for
the Btu input of equivalent steam models. Thermal oil systems
that do not deliver appropriate Btus will dry slower. For solenoid
valve wiring connections, refer to the Wiring Diagram supplied
with tumble dryer.