2-6
F-1021-0422
Drawbar Air System
Installation
1. Cut the Nylon Tubing into two equal lengths,
approximately 15ft each. Set aside.
2. Screw the coated threaded male end of the Push to
Connect Elbow into each air springs port. Insert a
Nylon Tube end into each Push to Connect Elbow.
3. Route the Nylon Tubing along the left and right sides
of frame and up the Drawbar to the Air Manifold.
4. Cut off any excess Nylon Tubing and insert ends into
the Air Manifold Assembly Push to Connect Elbows.
Cut ends of Nylon Tubing should be smooth and burr
free. Burrs can cause slow leaks.
5. Secure Nylon Tubing with tie wraps after all
Harnesses and Hydraulic Hoses have been installed.
6. When Assembly is complete, pressurize the Rear
Roller Air System.
See “Rear Roller Air System” on
Figure 2-5: Drawbar Air System
Push to Connect Elbow,
1/4 OD x 1/8 NPT
Air Manifold Assembly
Nylon Tubing
1/4" OD
Air Spring
Nylon Tubing
1/4" OD
Nylon Tubing 1/4" OD
Содержание Brillion SS16
Страница 4: ......
Страница 8: ...iv F 1021 0422 TABLE OF CONTENTS ...
Страница 18: ...1 10 F 1021 0422 TABLE OF CONTENTS Table provided for general use NOTES ...
Страница 35: ...F 1021 0422 2 17 TABLE OF CONTENTS Table provided for general use NOTES ...
Страница 78: ...3 20 F 1021 0422 TABLE OF CONTENTS Table provided for general use NOTES ...
Страница 96: ...5 10 F 1021 0422 TABLE OF CONTENTS Table provided for general use NOTES ...
Страница 98: ...6 2 F 1021 0422 TABLE OF CONTENTS Table provided for general use NOTES ...